3 floors · 176,400 sq ft · built 1955 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-09-27 (Accepted). Agency page | Dec 31, 2026 in 66 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 176,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2631). Agency page | Dec 31, 2031 in 1892 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 8, 2026 | Construction CLASS - 2 REISSUE ON ECB#35693386Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 301,302,30 #35734661H | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXIT SIGNS NOT WORKING WHEN T #35734662J | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 19, 2025 | Construction CLASS - 2 REISSUE: 35684754Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FIRE DOORS LOCATED AT 3RD FLOOR, 331A, 325, 323, 320A, 315, 309, 2ND FLOOR 220, 215 AND 214. REMEDY: COMPLY WITH CODE. #35693386Y | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 13, 2024 | Construction CLASS - 2 RE-ISSUE #35672127R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED INTERIOR FIRE-PROOF SELF-CLOSING DOORS LOCATED AT3RD FLR. 331A, 325, 323, 320A, 320, 315, 309, AT 2FLR. 220, 215, 214, #35684754Y | Sep 27, 2024 POP/IN-VIO | $0 |
| Aug 13, 2024 | Construction CLASS - 2 28-301.1. RE-ISSUE #35672129K-FAILURE TO PROVIDE VENTILATION TO GAS METER ROOM PER P115.6(1968 CODE), FGC APPENDIX E(E4)(2014 CODE). NOTED: OBSERVED INSIDE OF GAS METER ROOM, MECHANICAL VENTILATION DEVICE ON TH #35684752K | Sep 27, 2024 POP/IN-VIO | $0 |
| Jan 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION,OBSERVED AT STAIR B 1ST FLOOR,SELF-CLOSING FIRE PROOF DOOR IS WARPED AND NOT CLOSING PROPERLY.AUDITORIUM SELF-CLOSING FIRE DOORS 9 AND #35672127R | Apr 21, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05876 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05875 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05877 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 8, 2026 | ECB | Construction: REISSUE ON ECB#35693386Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 301,302,30 | Open |
| Jul 8, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXIT SIGNS NOT WORKING WHEN T | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:20 AM ET. BBL 2026310048.