13 floors · 527 apartments · 599,600 sq ft · built 1954 · class D9 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1596). Agency page | Dec 31, 2026 in 64 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-01 (Accepted). Agency page | Dec 31, 2026 in 64 days | 5 of 5 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 599,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-12-01) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 11, 2026 | Boilers CLASS - 2 @MECHANICAL STEAM ROOM IN CELLAR THE CONDENSATE TANK IS CORRODED+LEAKING+CONDENSATE TANK VENT IS INCORRECT+STEAM TRAP IS DEFECTIVE+STEAM COIL GASKET IS DEFECTIVE, MAINTAIN BOILER; CORRECT VIOLATION+SUBMIT CERTI #39192170P | Jul 9, 2026 POP/IN-VIO | $0 |
| Jan 6, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES. NOTE: EXP#1,WEST ELEVATION & EXP#3 EAST ELEVATION DISPLAY 3 WINDOW AIR CONDITIONING UNITS INSTALLED W/IMPROPER SUPPORT IE;WOOD PIECES,TIN CANS ETC. #35458213X | Mar 26, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00530 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00528 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00529 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00523 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00532 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00525 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00531 | DOB VIOLATION - ACTIVE |
| Jan 24, 2020 | FACADE SAFETY PROGRAM #HAZ88635 | DOB VIOLATION - ACTIVE |
| Jan 24, 2020 | FACADE SAFETY PROGRAM #HAZ88634 | DOB VIOLATION - ACTIVE |
| Oct 18, 2019 | FACADE SAFETY PROGRAM #HAZ88415 | DOB VIOLATION - ACTIVE |
| Jul 23, 2019 | FACADE SAFETY PROGRAM #HAZ88300 | DOB VIOLATION - ACTIVE |
| Jul 22, 2019 | FACADE SAFETY PROGRAM #HAZ88299 | DOB VIOLATION - ACTIVE |
| Jul 22, 2019 | FACADE SAFETY PROGRAM #HAZ88298 | DOB VIOLATION - ACTIVE |
| Jul 22, 2019 | FACADE SAFETY PROGRAM #HAZ88297 | DOB VIOLATION - ACTIVE |
| Jun 17, 2019 | FACADE SAFETY PROGRAM #HAZ88221 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01444 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jan 24, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 24, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Oct 18, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 23, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 22, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 22, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 22, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jun 17, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 21, 2016 | A | Apt 13F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 13F, 13th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 24, 2016 |
| Nov 22, 2013 | B | Apt 4G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EAST | Dec 27, 2013 |
| Nov 22, 2013 | A | Apt 4G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 25, 2014 |
| Nov 22, 2013 | A | Apt 4G · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CERAMIC FLOOR TILE AT RADIATOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 25, 2014 |
| May 15, 2009 | A | Apt 13H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 3rd BATHROOM FROM EAST, THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM S | Aug 18, 2009 |
| May 15, 2009 | B | Apt 13H · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM SOUTH AT WEST | Jun 19, 2009 |
| May 15, 2009 | B | Apt 13H · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM SOUTH AT WEST | Jun 19, 2009 |
| Jan 24, 2006 | B | Apt 2H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ROTTED WOOD BASE CABINETS IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2006 |
| Jan 24, 2006 | B | Apt 2H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW COUTER BALANCE LOWER SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2006 |
| Jan 24, 2006 | B | Apt 2H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2006 |
| Jan 24, 2006 | B | Apt 2H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SOUTH WALL LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2006 |
| Jan 24, 2006 | B | Apt 2H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, APARTMENT AT NORTH | Mar 5, 2006 |
| Jan 23, 2006 | B | Apt 2H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 4, 2006 |
| Jan 23, 2006 | B | Apt 2H · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 4, 2006 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
| Aug 3, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED NOTED AT 1ST FL UPK, NEAR MAIN ENTRA | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 10:12 AM ET. BBL 1015960001.