Manhattan · Block 1596 · Lot 1 · 10026

90 Lenox Avenue

13 floors · 527 apartments · 599,600 sq ft · built 1954 · class D9 · owner of record: Nyc Housing Authority

55open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1596). Agency page

Dec 31, 2026
in 64 days
Due this year
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual boiler inspection (5 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-01 (Accepted). Agency page

Dec 31, 2026
in 64 days
5 of 5 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 599,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

On fileCycle 10 filing on record: UNSAFE (2025-12-01)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jun 11, 2026Boilers CLASS - 2
@MECHANICAL STEAM ROOM IN CELLAR THE CONDENSATE TANK IS CORRODED+LEAKING+CONDENSATE TANK VENT IS INCORRECT+STEAM TRAP IS DEFECTIVE+STEAM COIL GASKET IS DEFECTIVE, MAINTAIN BOILER; CORRECT VIOLATION+SUBMIT CERTI
#39192170P
Jul 9, 2026
POP/IN-VIO
$0
Jan 6, 2020Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES. NOTE: EXP#1,WEST ELEVATION & EXP#3 EAST ELEVATION DISPLAY 3 WINDOW AIR CONDITIONING UNITS INSTALLED W/IMPROPER SUPPORT IE;WOOD PIECES,TIN CANS ETC.
#35458213X
Mar 26, 2020
POP/IN-VIO
$0
DOB (16)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00530
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00528
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00529
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00523
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00532
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00525
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00531
DOB VIOLATION - ACTIVE
Jan 24, 2020FACADE SAFETY PROGRAM

#HAZ88635
DOB VIOLATION - ACTIVE
Jan 24, 2020FACADE SAFETY PROGRAM

#HAZ88634
DOB VIOLATION - ACTIVE
Oct 18, 2019FACADE SAFETY PROGRAM

#HAZ88415
DOB VIOLATION - ACTIVE
Jul 23, 2019FACADE SAFETY PROGRAM

#HAZ88300
DOB VIOLATION - ACTIVE
Jul 22, 2019FACADE SAFETY PROGRAM

#HAZ88299
DOB VIOLATION - ACTIVE
Jul 22, 2019FACADE SAFETY PROGRAM

#HAZ88298
DOB VIOLATION - ACTIVE
Jul 22, 2019FACADE SAFETY PROGRAM

#HAZ88297
DOB VIOLATION - ACTIVE
Jun 17, 2019FACADE SAFETY PROGRAM

#HAZ88221
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01444
DOB VIOLATION - ACTIVE
DOB NOW Safety (23)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Jan 24, 2020Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jan 24, 2020Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Oct 18, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jul 23, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jul 22, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jul 22, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jul 22, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jun 17, 2019Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
HPD (14) · C 0 · B 10 · A 4
IssuedClassViolationCorrect by
Jul 21, 2016AApt 13F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 13F, 13th STORY, 3rd APARTMENT FROM NORTH AT EASTOct 24, 2016
Nov 22, 2013BApt 4G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EASTDec 27, 2013
Nov 22, 2013AApt 4G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EASTFeb 25, 2014
Nov 22, 2013AApt 4G · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CERAMIC FLOOR TILE AT RADIATOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 4G, 43rd STORY, 4th APARTMENT FROM NORTH AT EASTFeb 25, 2014
May 15, 2009AApt 13H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 3rd BATHROOM FROM EAST, THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM SAug 18, 2009
May 15, 2009BApt 13H · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM SOUTH AT WESTJun 19, 2009
May 15, 2009BApt 13H · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 13H, 13th STORY, 5th APARTMENT FROM SOUTH AT WESTJun 19, 2009
Jan 24, 2006BApt 2H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ROTTED WOOD BASE CABINETS IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2006
Jan 24, 2006BApt 2H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW COUTER BALANCE LOWER SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2006
Jan 24, 2006BApt 2H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2006
Jan 24, 2006BApt 2H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SOUTH WALL LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2006
Jan 24, 2006BApt 2H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, APARTMENT AT NORTHMar 5, 2006
Jan 23, 2006BApt 2H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 4, 2006
Jan 23, 2006BApt 2H · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 4, 2006

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open
Aug 3, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED NOTED AT 1ST FL UPK, NEAR MAIN ENTRAClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:12 AM ET. BBL 1015960001.

Look up another building