6 floors · 86 apartments · 94,428 sq ft · built 1960 · class D1 · owner of record: Dy 90 Laurel Hill Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 94,428 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2149). Agency page | Dec 31, 2029 in 1157 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 9, 2025 | Unknown CLASS - 2 FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED: AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 1 LEVEL BELOW THE BUILGING. OBSERVED SOME CRACKS ON THE WALLS AND SOME BEA #35718216J | Nov 13, 2025 DEFAULT | $6,250 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#916379.REM:SUBMIT ACCEPTABLE REQUIRED T #37024358L | Nov 13, 2025 IN VIOLATION | $1,250 |
| Nov 2, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR OF BLDG FACADE&APPURTENANCES.NOTE:OBSERVED VERT CRACK IN BRICK MASONRY UNDER EACH WINDOW ON RIGHT SIDE OF LEFT SIDE OF EXP1.LONGITUDINAL CRACK (JOINT ONLY),STEP CRACK&VERT CRACK IN #35669140Y | Nov 21, 2023 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01907 | DOB VIOLATION - ACTIVE |
| Jun 25, 2008 | ELEVATOR #1P8242 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 21, 2018 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICKWORK POINTING EAST & SOUTH WALLS NORTH ENTRANCE TO CELLAR NORTH YARD. | Mar 28, 2018 |
| Feb 21, 2018 | B | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS COMPACTOR CELLAR NORTH & SOUTH SECTIONS. | Mar 28, 2018 |
| Feb 21, 2018 | B | Apt 2A · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 2 STY EAST APT 2A SOUTH SECTION. LOCATED AT APT 2A | Mar 28, 2018 |
| Feb 21, 2018 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2008 |
| Feb 21, 2018 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2008 |
| Feb 21, 2018 | A | Apt 2A · § 27-2005 ADM CODE REFIT WOOD DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 27, 2018 |
| Feb 21, 2018 | A | Apt 3K · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ****PARTITION WALL ERRECTED, CREATING ADDITIONAL ROOM.*** IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FR | May 27, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)