Staten Island · Block 3343 · Lot 17 · 10305

90 Hancock Street

2 floors · 2,480 sq ft · built 1989 · class O2 · owner of record: Louis Grillo

3open violations
$43,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1142dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $43,750 owed
IssuedViolationHearingBalance
Oct 5, 2026Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR OF BUILDING. OBSERVED VERTICAL AND HORIZONTAL CRACKS AT EXPOSURES 1, 2, AND 4 OF THE BUILDING FACADE. ADDITIONALLY, AT EXPOSURE 1, BETWEEN THE 1ST AND 2ND STORIES, A SECTION OF META
#39206700H
Dec 16, 2026
PENDING
$6,250
Jul 2, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION FOR VIO#3917375J OBSERVED AT EXT#1,2,4 . CRACKS IN STUCCO . ONE LARLE CRACK AT EXP#1 AT SECOND FLOOR WINDOW ., REPAIR AND/REPLACE
#39194652R
Sep 16, 2026
DEFAULT
$25,000
Jan 13, 2026Construction CLASS - 1
ATOI OBSERVED VERTICAL AND HORIZONTAL CRACKS THROUGHOUT AT ALL EXPOSURES. AT EXPOSURE 1, PANEL BETWEEN 1ST AND 2ND STORY WINDOW IS REQUIRED TO BE FULLY SECURED., REPAIR AND/REPLACE
#39173575J
Apr 1, 2026
DEFAULT
$12,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 5, 2026ECBConstruction: FAILURE TO MAINTAIN EXTERIOR OF BUILDING. OBSERVED VERTICAL AND HORIZONTAL CRACKS AT EXPOSURES 1, 2, AND 4 OF THE BUILDING FACADE. ADDITIONALLY, AT EXPOSURE 1, BETWEEN THE 1ST AND 2ND STORIES, A SECTION OF METAOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 3:38 AM ET. BBL 5033430017.

Look up another building