3 floors · 2 apartments · 2,700 sq ft · built 1928 · class S2 · owner of record: Rakan9 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1152 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 6, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT, I OBSERVED IN CELLAR 3 NEW WATER HEATERS AND 2 BOILERS INSTALLED WITH ALL TYPICAL PIPING 100% COMPLETED IN BASEMENT WITH NO PERMITS IN THE DOB SYSTEM., OBTAIN ALL PERMITS #39199386X | Jan 4, 2027 PENDING | $1,250 |
| Aug 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN, IN BASEMENT I OBSERVED THE GAS METERS BEING BLOCKED BY SHELVES USED FOR STORAGE PROHIBITING ACCESS TO METERS. AS PER APPENDIX E 3.3 GAS METER ROOMS SHALL NOT BE USED IN ANY WAY FOR STORAGE #39199385Y | Jan 4, 2027 PENDING | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 6, 2026 | ECB | Construction: WORK WITHOUT PERMIT, I OBSERVED IN CELLAR 3 NEW WATER HEATERS AND 2 BOILERS INSTALLED WITH ALL TYPICAL PIPING 100% COMPLETED IN BASEMENT WITH NO PERMITS IN THE DOB SYSTEM., OBTAIN ALL PERMITS | Open |
| Aug 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN, IN BASEMENT I OBSERVED THE GAS METERS BEING BLOCKED BY SHELVES USED FOR STORAGE PROHIBITING ACCESS TO METERS. AS PER APPENDIX E 3.3 GAS METER ROOMS SHALL NOT BE USED IN ANY WAY FOR STORAGE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 5:50 PM ET. BBL 3069050016.