3 floors · 3 apartments · 3,342 sq ft · built 1899 · class C0 · owner of record: 1107 Putnam Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 5, 2016 | B | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT) | Aug 9, 2016 |
| Apr 17, 2013 | B | Apt CC · § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS .. IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT CC | May 22, 2013 |
| Apr 17, 2013 | C | Apt 3 · § 231 M/D LAW PROVIDE LEGAL SECOND MEANS OF EGRESS AND FILE APPLICATION FOR APPROVAL BEFORE DOING THE WORK CONSISTING OF A NEW FIRE ESCAPE ERECTED AT THE BUILDING REAR LOCATED AT APT 3, 3rd STORY | Apr 23, 2013 |
| Feb 22, 2013 | C | § 187 M/D LAW PROVIDE A SPRINKLER SYSTEM OR A LEGAL SECOND MEANS OF EGRESS AND FILE APPLICATION FOR APPROVAL BEFORE DOING THIS WORK ENTIRE BUILDING | Feb 28, 2013 |
| Feb 22, 2013 | B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BATHTUB, WASH BASIN AND WATER CLOSET AT CELLAR | Mar 29, 2013 |
| Feb 22, 2013 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING HASP AND EYE PRESENT AT SCUTTLE COVER AT ROOF | Mar 29, 2013 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 10:41 AM ET. BBL 3014850068.