Brooklyn · Block 685 · Lot 3 · 11232

895 4 Avenue

3 floors · 4 apartments · 4,000 sq ft · built 1923 · class S4 · owner of record: Basad Partners On 4th Llc

17open violations
$61,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-11-30 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029

Open violations

ECB / OATH (6) · $61,250 owed
IssuedViolationHearingBalance
Dec 23, 2025Unknown CLASS - 1
WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ILLEGAL ELECTRICAL WORK COMPLETED INSTALLING OUTLETS, SWITCHES, AND LIGHT FIXTURES FOR KITCHEN AREA, BATHROOM APPLIANCES/FIXTURES, AND ROOMS INSIDE ILLEGAL C
#39171520N
Mar 11, 2027
DEFAULT
$12,500
Dec 23, 2025Construction CLASS - 2
WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ILLEGAL PLUMBING WORK COMPLETED IN THE CELLAR. INSTALLING UNAUTHORIZED WATER, AND WASTE LINES FOR 3 PCS BATHROOM (SINK, TOILET, STALL SHOWER) FOR CELLAR UNIT
#39171519X
Mar 11, 2027
DEFAULT
$6,250
Dec 23, 2025Construction CLASS - 1
WORK WITHOUT ATOI, OBSERVED FULL PARTITIONS WALLS ERECTED TO SUB-DIVIDE THE CELLAR CREATING APARTMENT UNIT. ADDITIONAL ROOM FOR SLEEPING/RECREATIONAL SPACE, KITCHEN AREA WITH HOT PLATE, FOOD, COOKING EQUIPMENT,
#39171518Y
Mar 11, 2027
DEFAULT
$12,500
Dec 23, 2025Construction CLASS - 1
OCCUPANCY CONTRARY TO C OF O OR BUILDING RECORDS. ATOI, OBSERVED FULL PARTITIONS WALLS ERECTED TO SUB-DIVIDE THE CELLAR CREATING RECREATIONAL ROOM WITH 3 BEDS IN SLEEPING POSITION, KITCHEN AREA WITH HOT PLATE,
#39171516K
Mar 11, 2027
DEFAULT
$12,500
Dec 23, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION, OBSERVED IN THE CELLAR ON THE CEILINGS INSIDE THE BOILER/U
#39171517M
Mar 11, 2027
DEFAULT
$12,500
Sep 19, 2023Cranes and Derricks CLASS - 1
AT THE TIME OF INSPECTION, OBSERVED ONGOING CONSTRUCTION ON ACTIVE JOBSITE. UPON REVIEW OF DOB NOW/BIS, IT WAS OBSERVED THAT THE GC'S DIABILITY INSURANCE IS EXPIRED. EXPIRATION DATE IS 8/14/2023. *STOP ALL WORK
#35652550X
Apr 16, 2024
IN VIOLATION
$5,000
DOB (3)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#08471
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#07577
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#18396
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (5) · C 0 · B 0 · A 5
IssuedClassViolationCorrect by
Apr 30, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 3, 2026
Jun 5, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 8, 2025
Apr 3, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 7, 2024
Mar 17, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 20, 2023
Feb 18, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 24, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 9:43 AM ET. BBL 3006850003.

Look up another building