4 floors · 35,556 sq ft · built 1964 · class E1 · owner of record: Golden Seldan Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 35,556 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 17, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. PLUMBING WORK NOTED. AT THE TIME OF INSPECTION, I OBSERVED A NEWLY INSTALLED GAS LINE FOR A STOVE, SLOP SLINK, AND A 2 PCS BATHROOM IN THE WAREHOUSE. THE WORK IS COMPLETED 100%, NO FILING #39200822Z | Oct 28, 2026 PENDING | $2,500 |
| Aug 17, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED BROKEN WINDOWS ON THE 3RD FLOOR LEVEL, CRACKS ON THE MASONRY BRICK FACADE AND DEFECTS AROUND #39200821R | Oct 28, 2026 PENDING | $2,500 |
| Sep 21, 2001 | Construction Non-Hazardous FAILURE TO MAINTAIN: HAZARDOUS DEFECTS ARE: (1) BRICKS AT BOTH CHIMNEYS AT ROOF SOUTH ARE LOOSE, UNKEYED. AND CHIMNEYS ARE LEANING TOWARD SOUTH. (2) LOOSE AND UNKEYED BRICKS AT CHIMNEYS AT ROOF WEST, ALSO APPEA #34304101N | Dec 17, 2001 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 21, 2001 | CONSTRUCTION WORK WITHOUT A PERMIT: WORK NOTED: NEW FLOOR CONSTRUCTED WITH PLYWOOD AND OPEN WEB STEEL JOISTS AT 4TH STORY (2) ALL JUSIBLE LINK FIRE DOORS ARE NOW SEAL WITH MASONRY BRICKS AT WEST WALL THROUGHOUT ALL STORIES (3) TWO STRUCTURES EACH APPROX 101'FT HIGH 15'FT WIDE 30'FT LONG REMEDY: OBTAIN A PERMIT #08HD02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 21, 2001 | CONSTRUCTION ECB HAZARDOUS #08HD03 | DOB VIOLATION - ACTIVE |
| May 24, 2001 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTED PARTITION WALL ON 1ST FLOOR CREATED 4 ROOMS AND TOILET REMEDY: OBTAIN PERMIT #08AP04 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 5, 2000 | CONSTRUCTION #C08T03 | DOB VIOLATION - ACTIVE |
| Sep 5, 2000 | CONSTRUCTION #C08T12W | DOB VIOLATION - ACTIVE |
| Sep 5, 2000 | CONSTRUCTION WORK WITHOUT A PERMIT. NOTED: WOOD SCAFFORD CONSTRUCTED AT FRONT OF PR EMISES REMEDY: OBTAIN A PERMIT FORTWITH OR REMOVE ILLEGAL SCAFFORD IMMEDIATEL Y ANY RESTORE PREMISES TO PRIOR LEGAL CONDITION #C08T2VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 19, 2000 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: INTERIOR DEMOLITION OF BUILDING DEBRIS BEING REMOVED BY SIDEWALK CHUTE. WOOD CHUTE AT 2ND FLOOR TO CON TAINER AT STREET, CHUTE HEIGHT AT STREET APPROX 9' HEIGHT. ALL WINDOWS MISSING AT 3RD FLOOR. NO PROTECTION. REMEDY: STOP WORK ORDER IN EFFECT. NON-COMPLIANCE #081P02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 14, 2000 | CONSTRUCTION INTERIOR DEMO OF BUILDING NO INTERIOR PROTECTION NO WINDOWS AT 3 AND 4 FL DEMO OF FLOORING AND WALLS STOP ALL WORK #08AP03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 14, 2000 | CONSTRUCTION NO PERMIT FOR SIDEWALK CHUTE WOOD CHUTE OPEN AT SIDE ERECTED OVER SIDE WALK FROM 2 FL OF BUILDING TO CONTAINED AT STREET APPROX 20 YD CONTAIN ED CONTAINIER LOADER WITH DEBRIS TO TOP #08AP02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 14, 2000 | CONSTRUCTION #08AP04 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #28704 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 17, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. PLUMBING WORK NOTED. AT THE TIME OF INSPECTION, I OBSERVED A NEWLY INSTALLED GAS LINE FOR A STOVE, SLOP SLINK, AND A 2 PCS BATHROOM IN THE WAREHOUSE. THE WORK IS COMPLETED 100%, NO FILING | Open |
| Aug 17, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED BROKEN WINDOWS ON THE 3RD FLOOR LEVEL, CRACKS ON THE MASONRY BRICK FACADE AND DEFECTS AROUND | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:18 AM ET. BBL 3011410028.