Brooklyn · Block 2085 · Lot 7504 · 11201

89 Dekalb Avenue

30 floors · 922,500 sq ft · built 2023 · class R0 · owner of record: Long Island University

2open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
118dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 118 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 922,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2085). Agency page

Dec 31, 2035
in 3353 days
Next due 2035

Open violations

ECB / OATH (2) · $12,500 owed
IssuedViolationHearingBalance
Oct 1, 2026Cranes and Derricks CLASS - 2
AT TIME OF INSPECTION OBSERVED NO SUSPENDED SCAFFOLD EQUIPMENT ON SITE. NOTIFICATION FOR B01173016-I1 - 2342 WITH NO PRIOR REMOVAL NOTICE. UPON REVIEWING DOB SYSTEM NO NOTIFICATION ON RECORD/FOUND FOR REMOVAL
#39559998N
Dec 9, 2026
PENDING
$2,500
Jun 4, 2024Unknown CLASS - 2
SITE SAFETY PLAN PHASES INADEQUATE/CONTRARY AS PER BC 3301.13.1: AT INSPECTION, IT WAS OBSERVED DIESEL TANK FOR CRANE AERIAL FUEL LOADING AT EXP.1 AND PIECES OF CRANE TO BE JUMPED ON VARIOUS FLOORS THAT WERE MI
#39529288L
Nov 20, 2026
DEFAULT
$10,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 1, 2026ECBCranes and Derricks: AT TIME OF INSPECTION OBSERVED NO SUSPENDED SCAFFOLD EQUIPMENT ON SITE. NOTIFICATION FOR B01173016-I1 - 2342 WITH NO PRIOR REMOVAL NOTICE. UPON REVIEWING DOB SYSTEM NO NOTIFICATION ON RECORD/FOUND FOR REMOVALOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 11:45 PM ET. BBL 3020857504.

Look up another building