Queens · Block 9760 · Lot 61 · 11432

89-34 162 Street

7 floors · 30,266 sq ft · built 2011 · class H3 · owner of record: 3551 Boston Associates Llc

4open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
187dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 30,266 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 431 days
Next cycle year 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $56,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2025-11-24)

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
Sep 21, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OBSERVED PVC BEING USED ON WASHING MACHINE DRAINAGE WHICH IS CONTRARY TO PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE
#39204812N
Dec 1, 2026
PENDING
$1,250
Sep 29, 2025Boilers CLASS - 2
FOUND WATER HEATER MODEL# D100-199 SERIAL# F8-3225 LEAKING, MAINTAIN BOILER; CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION
#39161736N
Dec 9, 2025
STIPULATION/IN-VIO
$1,250
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 21, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED PVC BEING USED ON WASHING MACHINE DRAINAGE WHICH IS CONTRARY TO PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 7:29 PM ET. BBL 4097600061.