Queens · Block 9361 · Lot 35 · 11418

89-30 133 Street

2 floors · 2 apartments · 3,360 sq ft · built 1925 · class B3 · owner of record: Islam, Atika

0open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
307dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 14, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES .. WITH INCORRECT LOCATION IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUClosed
Aug 14, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Aug 13, 2026HPD B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQFT AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD C§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD B§ 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ROTTED PANEL INSIDE BASECABINET UNDER SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed
Jul 9, 2026HPD B§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT SOUTH WALL IN THE FOYER LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 7:49 PM ET. BBL 4093610035.

Look up another building