6 floors · 91 apartments · 93,480 sq ft · built 1942 · class D1 · owner of record: Jamaica Seven Llc C/O
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 93,480 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9755). Agency page | Dec 31, 2035 in 3353 days | Next due 2035 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-24 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 27, 2026 | C | Apt 4P · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITION UNIT INSTALLED ON WINDOW TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''H-R'', AT SOUTH | Jun 2, 2026 |
| May 26, 2026 | B | Apt 4P · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER SYSTEM FROM VESTIBULE AREA TO NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''H-R'', AT SOUTH | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4P · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN SINK WASTE LINE IN THE KITCHEN LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''H-R'', AT SOUTH | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4P · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SEC | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4P · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE LOWER SASH OF 1ST WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''H-R'', AT SOUTH | Jun 30, 2026 |
| May 1, 2026 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 27, 2026 |
| May 1, 2026 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 27, 2026 |
| Sep 5, 2025 | C | Apt 1F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North'' | Oct 1, 2025 |
| Sep 5, 2025 | B | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North'' | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt 1F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North'' | Oct 10, 2025 |
| Sep 5, 2025 | C | Apt 1F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30SQ FEET AT CEILING,EAST WALL,NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North'' | Oct 1, 2025 |
| Aug 20, 2025 | C | Apt 6J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2025 |
| Feb 13, 2025 | A | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | May 19, 2025 |
| Feb 13, 2025 | A | Apt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | May 19, 2025 |
| Sep 11, 2024 | C | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Oct 7, 2024 |
| Sep 11, 2024 | C | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Oct 7, 2024 |
| Sep 9, 2024 | C | Apt 6C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 17, 2024 |
| Sep 9, 2024 | C | Apt 6C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 17, 2024 |
| Sep 9, 2024 | C | Apt 6C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT W | Oct 17, 2024 |
| Sep 4, 2024 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Sep 30, 2024 |
| Sep 4, 2024 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Sep 30, 2024 |
| Nov 30, 2023 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Dec 26, 2023 |
| Nov 29, 2023 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Jan 3, 2024 |
| Nov 29, 2023 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Jan 3, 2024 |
| Jul 31, 2023 | B | Apt 4L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 4P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 3L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 1J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 1M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1M, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 1R · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 1P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1P, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 6B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 2C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2C, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 2F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 1A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 6J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 5J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 5K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 5L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 5N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 4, 2023 |
| Jul 31, 2023 | B | Apt 6C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 4, 2023 |
| Jul 5, 2023 | C | Apt 4A · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 9, 2023 |
| Jul 5, 2023 | C | Apt 4A · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 9, 2023 |
| Sep 14, 2022 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 10, 2022 |
| Sep 14, 2022 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 10, 2022 |
| Feb 16, 2021 | B | Apt 2L · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Mar 23, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 5:04 PM ET. BBL 4097550006.