| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 80,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $288,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 485 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9758). Agency page | Dec 31, 2028 in 799 days | Next due 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-09 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 1, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39128630K., FILE A CERTIFICATE OF CORRECTION #39168801M | Feb 10, 2026 IN VIOLATION | $1,250 |
| Dec 1, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39128629N., FILE A CERTIFICATE OF CORRECTION #39168800K | Feb 10, 2026 IN VIOLATION | $1,250 |
| Sep 29, 2025 | Elevators CLASS - 2 CLASS 2 ITEMS: BRAKE PADS NOT FULLY ENGAGE WITH DISC, ADJUST. CLEAN ENTIRE PIT AREA. IN-CAR INSPECTION/ACCESS SWITCH INOPERATIVE, REPAIR. #39161807L | Jun 15, 2026 IN VIOLATION | $312 |
| Sep 29, 2025 | Elevators CLASS - 2 CLASS 2 ITEMS: EMERGENCY ALARM VOLUME TOO LOW, REPAIR. DOOR CLATCH MAKING SCRAPING NOISE WHEN THE CAR APPROACHING BASEMENT LEVEL, ADJUST. EMERGENCY PHONE VOLUME TOO LOW, ADJUST. DOOR ZONE RESTRICTOR NOT MAINTAI #39161808N | Jun 15, 2026 IN VIOLATION | $312 |
| Oct 28, 2024 | Construction CLASS - 1 B101 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED EXCESSIVE CRACKS THROUGHOUT STAIRWAY A & B FROM ROOF LEVEL TO BASEMENT., REPAIR AND/REPLACE #39128630K | Jan 7, 2025 IN VIOLATION | $0 |
| Oct 28, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED HOLE PENETRATIONS AT THE BASEMENT LEVEL IN LAUNDRY ROOM AREA. POTENTIALL #39128629N | Jan 7, 2025 IN VIOLATION | $0 |
| Feb 26, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES.NOTE:OBSERVEDAT EXP.#4(SOUTH) PARAPET-SPALLING LIMESTONE & EXPOSED REBAR.THIS IS A NEW CONDITION NOT MENTIONED IN THE QEWI15 SWARMP REPORT FILLED ON 02/1 #35640234X | May 31, 2022 ADMIT/IN-VIO | $0 |
| Feb 26, 2022 | Construction CLASS - 2 REMOVAL OF PUBLIC PROTECTION FROM UNSAFE FACADE WITHOUT APPROVAL FROM THE DEPARTMENT.NOTE:AT THE TIME OF INSPECTION OBSERVED PUBLIC PROTECTION SUCH AS SIDEWALK SHED,FENCE,NETTING ETC.REMOVED FROM SITE DESIGNATE #35640233Y | May 24, 2022 ADMIT/IN-VIO | $0 |
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY28-302.5 FOR CONTROL#811613.FILE ACCEPTABLE REPORT #37022337N | Jul 19, 2022 PENDING | $0 |
| Jul 18, 2018 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.THE AMOUNT OF FLS IN BLDG DOES NOT MATCH THE AMOUNT OF FLS ON THE C OFO #50136,WHICH INDICATES BLDG TO HAVE EIGHT (8) FLS, BLDG CURRENTLY HA #35345995Z | Dec 4, 2018 IN VIOLATION | $0 |
| Mar 19, 2018 | Construction CLASS - 3 WORK WITHOUT A PERMIT. NOTED: C OF O #50136 STATES THE BUILDING IS LEGALLY 8 FLOORS AND AT TIME OF INSPECTION OBSERVED THE BUILDING HAS BASEMENT AND 9 FLOORS ABOVE. #35331812J | Dec 19, 2018 IN VIOLATION | $0 |
| Jan 26, 2018 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS. FLOORS DO NOT MATCH COFO #50136. SHELTER ON SOME FLOORS FOR DHS. UNSAFE USE AND FLOORS. RMDY:DISCONTINUE ILLEGAL USE #35311350X | Dec 4, 2018 IN VIOLATION | $0 |
| Aug 1, 2017 | Construction CLASS - 3 WORK W/O A PERMIT. NOTED: AT THE 2ND FL ROOF,2 SHEDS ERECTED. ONE IS APPROX 7'X5'10' & THE OTHER IS 9'X8'X10'. NO PERMITS WERE ISSUED FOR SAID WORK. REMEDY: OBTAIN ALL REQUIRED PERMITS. #35286823P | Jan 16, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 18, 2018 | FACADE SAFETY PROGRAM #HAZ87218 | DOB VIOLATION - ACTIVE |
| Jul 10, 1989 | PUBLIC ASSEMBLY #121305SAS | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Feb 18, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 30, 2026 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ACOUSTIC CEILING TILES AT PUBLIC HALL, 4th STORY | Oct 3, 2026 |
| Jun 30, 2026 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ACOUSTIC CEILING TILES AT PUBLIC HALL, 3rd STORY | Oct 3, 2026 |
| Jun 17, 2026 | B | § 27-2005 HMC: REFIT SPRINKLER ROOM DOOR | Jul 22, 2026 |
| May 6, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 9, 2026 |
| Dec 23, 2025 | C | Apt 630 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND ALL WALLS 35 SQ FT IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 630, 5th STORY, 5th B-ROOM FROM SOUTH AT WEST , SECTION AT EAST | Jan 18, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Jun 30, 2026 | HPD A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ACOUSTIC CEILING TILES AT PUBLIC HALL, 4th STORY | Open |
| Jun 30, 2026 | HPD A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ACOUSTIC CEILING TILES AT PUBLIC HALL, 3rd STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 3:13 PM ET. BBL 4097580001.