| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 94,916 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $2,231,100 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 849 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2722). Agency page | Dec 31, 2032 in 2258 days | Next due 2032 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6, 7C, 8C, AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #907738. AGG1: PRIOR NOV 3702658 #37036574Y | Jan 29, 2027 PENDING | $3,125 |
| Jan 15, 2026 | Elevators CLASS - 1 1)IN-CAR COMMUNICATION INOPERATIVE. 2)CLEANING OF ELEVATOR PIT. 3)MACHINE SHIV WORN. 4)ELEVATOR RUNBY SIGN IS BLANK. 5)PROVIDE COVER FOR DOOR OPERATOR. #39174009J | Mar 11, 2027 PENDING | $1,250 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6, 7C, 8C, AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #907738. REMEDY: FILE ACCEPTABLE #37026568Z | Jun 7, 2024 ADMIT/IN-VIO | $0 |
| Mar 7, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #707738.AGG2 HISTORY OF NONCOMPLIANCE ON 3602391 #37009323X | Jun 1, 2018 IN VIOLATION | $0 |
| Feb 9, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AS NOTED: EXPOSURE #1 STEP CRACKS, DAMAGED MORTAR JOINTS, DAMAGED A/C VENTS, VERTICAL CRACKS AT ----, CRACKS UNDER WINDOWS, DAMAGED WINDOW SILLS, #35265117P | Apr 13, 2018 IN VIOLATION | $0 |
| Sep 18, 2017 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE @TIME OF INSPECTION ON EXPOSURE # 1 EAST ELEV. I OBSERVED CRACKS & STEP CRACKS @ NORTH EAST EDGE OF BLDG ON THE 8TH & 9TH FL & PARAPET LEVELS #35264465R | Nov 3, 2017 IN VIOLATION | $0 |
| Dec 7, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES ASREQUIRED BY ARTICLE 28.302 AND THE DEPARTMENT OF BUILDINGS RULES AND R #36023912Z | Jun 24, 2016 IN VIOLATION | $0 |
| Jan 5, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULAT #36027052X | May 29, 2015 IN VIOLATION | $0 |
| Dec 30, 2014 | Construction CLASS - 2 FAIL TO MAINTAIN EXTERIOR BLDG.NOTE:EAST ELEV EXP #1-STAIR B-VERTICAL CRACK WINDOW SILL TO HEADER FLS GROUND TO 8.9 FL LINTELS MISSING MORTAR.GROUND FL BRICK CRACKED @LINTEL,COLUMNS CRACKED.NORTHERN SECT EAST E #35095388H | Apr 10, 2015 DEFAULT | $0 |
| Dec 11, 2013 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. NOTED AT EXPOSURE 1 (EAST ELEVN) A-STEP CRACKS AT SPANDRELS BETW FLOORS 1&2, 2&3 AND 3&4 AT SOUTHEND (STAIRCASE B) AND B-SPALLED BRICKWORK AT 7/F WINDOWS #35024126J | Feb 14, 2014 IN VIOLATION | $0 |
| Jul 20, 2012 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/ARTICLE 28-302 OF THE BUILDING CODE & DEPT OF BLDGS RULES & REGULATIONS.(36018238J)RESPONDENT HAS DEMONSTRATED A HISTORY OF NON-COMPLIANCE #36018554L | Oct 26, 2012 IN VIOLATION | $0 |
| Jul 11, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS: NOTED: 1) EXP 1 (SOUTH END) - STEP CRACKS BETWEEN FLRS 1 & 2, 2 & 3 AND 3 & 4. 2) EXP 1 (SECTION - SPALLED MASONRY AT 7/F WINDOW TOP RIGHT CORNER. REMEDY:MAINTAIN BLDG EXTERIORS #34984679L | Aug 31, 2012 IN VIOLATION | $0 |
| Jan 15, 2012 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB'S RULES & REGULATIONS. #36018238J | Jun 1, 2012 IN VIOLATION | $0 |
| Jun 13, 2011 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG EXTERIORS.STEP CRACKS WERE FOUND @ SPANDRELS @ SOUTHEND OF FRONT ELEVN JL BETW 1/F & 2/F & 2/F & 3/F.BULKED BRICKWORK WAS FOUND @ 7/F & 9/F WINDOWS CORNER @ FRONT ELEVN.REM:REPAIR DEFEC #34872311R | Jul 29, 2011 STIPULATION/IN-VIO | $0 |
| Apr 15, 2011 | Construction CLASS - 2 FAIL TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES & REGUALTIONS 36014048K. #36016558J | Aug 19, 2011 DEFAULT | $0 |
| Jan 31, 2011 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS. STEP CRACKS WERE FOUND AT SPANDRELS BETWEEN 1/F & 2/F AND 2/F & 3/F ETC AT SOUTH STAIRCASE FACADE AT SOUTH OF POINT ELEVN. REMEDY: REPAIR DEFECTS INCLUDING BUT NOT LIMITED TO #34872192N | Mar 18, 2011 IN VIOLATION | $0 |
| Aug 4, 2010 | Construction CLASS - 2 FAIL TO MAINTAIN BLDG WALL. STEP CRACKS WERE FOUND @ SPANDRELS @ VARIOUS FLOORS @ SOUTH STAIRCASE 47 SOUTH OF FRONT ELEVN- 5/F,3/F/,2/F,1/F . REM:MAINTAIN BLDG WALLS. REPAIR DEFECTS INCLUDING BUT NOT LIMITED TO #34837439M | Oct 1, 2010 DEFAULT | $0 |
| Jul 12, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & DOB RULES & REGULATIONS REMEDY: #36014048K | Oct 15, 2010 IN VIOLATION | $0 |
| Jul 9, 2010 | Construction CLASS - 2 FAIL TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS. PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULA #36013871M | Sep 22, 2010 IN VIOLATION | $0 |
| Jul 9, 2010 | Construction CLASS - 2 FAIL TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT FRONT FACADE EAST ELEVATION STAIRWELL WINDOWS HAVE STEP CRACKS FROM UNDER SILLS 1ST FLRS UP TO 9TH FL AT TIME OF INSPECTION. REMEDY: PROVIDE FOR PUBLIC SA #34852785K | Sep 3, 2010 STIPULATION/IN-VIO | $0 |
| Oct 23, 2009 | Construction CLASS - 2 FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB RULES AND REGULATIONS #36010008H | Feb 19, 2010 IN VIOLATION | $0 |
| Jan 30, 2009 | Construction CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES & REGULATIONS #36007996P | Feb 19, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101435 | DOB VIOLATION - ACTIVE |
| Apr 8, 2021 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #909314 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04172 | DOB VIOLATION - ACTIVE |
| Jul 11, 2019 | FACADE SAFETY PROGRAM #HAZ68276 | DOB VIOLATION - ACTIVE |
| Jul 11, 2019 | FACADE SAFETY PROGRAM #HAZ88278 | DOB VIOLATION - ACTIVE |
| Jul 11, 2019 | FACADE SAFETY PROGRAM #HAZ78277 | DOB VIOLATION - ACTIVE |
| May 2, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00127 | DOB VIOLATION - ACTIVE |
| Jan 17, 2018 | CONSTRUCTION OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FILED BY A REGISTER DESIGN PROF.AS REQ'D BY AC28-302 & DOB RULES AND REGULATIONS.REMEDY: SUBMIT ACCEPTABLE EXTERIOR WALLS & APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT BY REGISTE #LL20210KD | DOB VIOLATION - ACTIVE |
| Dec 13, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00196 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #05143 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #05142 | DOB VIOLATION - ACTIVE |
| Mar 12, 2014 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00105 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #00941 | DOB VIOLATION - ACTIVE |
| Aug 15, 2012 | ELEVATOR #ACC101176 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF44686 | DOB VIOLATION - ACTIVE |
| May 31, 1989 | PUBLIC ASSEMBLY #0404IL | DOB VIOLATION - ACTIVE |
| May 31, 1989 | PUBLIC ASSEMBLY #0404I | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Apr 8, 2021 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jul 11, 2019 | Facades FISP CYCLE 7C UNSAFE REPORT FILED | Active |
| Jul 11, 2019 | Facades FISP CYCLE 6 UNSAFE REPORT FILED | Active |
| Jul 11, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| May 2, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 13, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Mar 12, 2014 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 20, 2026 | B | Apt 9N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATH TUB IN THE BATHROOM LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2026 |
| Jan 6, 2026 | B | Apt 6H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER/ INTERCOM SYSTEM FROM THE BUILDING VESTIBULE DOOR TO THE APARTMENT WALL PANEL AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6H, 6th STORY, 7th APARTMENT FROM NORTH AT EAST | Feb 10, 2026 |
| Feb 25, 2025 | C | Apt 5E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 23, 2025 |
| Dec 31, 2024 | B | Apt 5E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COVER AT BASEBOARD HEATER AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 4, 2025 |
| Dec 31, 2024 | B | Apt 5E · § 27-2005 ADM CODE PROVIDE STRAINER AT WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 4, 2025 |
| Dec 31, 2024 | B | Apt 5E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINGLE HANDLE COMBINATION FAUCET AT BATHTUB IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 4, 2025 |
| Nov 21, 2024 | B | Apt 5E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER FOR RADIATOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 26, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)