3 floors · 5 apartments · 4,800 sq ft · built 1925 · class S5 · owner of record: Clarista Holdings Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 14, 2011 | Construction CLASS - 2 ALTERED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1 - 28-118.3.2. NOTED: ALT TYPE 1 310041656 HAS NOT BEEN SIGNED-OFF FOR FINAL C/O BLDGIS OCCUPIED.REMEDY:OBTAIN A VALID C/O OR DISCONTINUE ILLEGAL OCCUPANCY #34930237K | Apr 25, 2012 WRITTEN OFF | $0 |
| Feb 27, 2010 | Construction CLASS - 2 FAIKLURE TO MAINTAIN BLDG IN ACODE COMPLAINT MANNER NOTE 1ST FLR FIRE SEPERATION WALL IN PUBLIC HALL WALL HAVE BEEN REMOVED 7 NOT MAINTAINED DUE TO WORK DONE UNDER ALT#310041646-01-AL PLAN INDICATE A ZHRRATED W #34817491L | Apr 19, 2010 WRITTEN OFF | $0 |
| Mar 21, 2008 | Construction Non-Hazardous EXIT PASSAGEWAY REQUIRED WIDTH DECREASED BY OBSTRUCTION NOTED FIRE ESCAPE PASSAGEWAY FOR 885 AND 889 4 AVE AT REAR OF BLDG IS OBSTRUCTED BY DEBRIS AND CONSTRUCTION MATERIALS CREATING A HAZARDOUS CONDITION IF #34633915J | Sep 23, 2009 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #10124 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31918 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 21, 2025 | C | Apt 3F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 21, 2025 |
| Nov 21, 2025 | C | Apt 3F · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 21, 2025 |
| Jun 8, 2023 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TREADS, 3RD-10TH TREAD FROM BOTTOM AT STAIRS TO BULKHEAD | Jun 14, 2023 |
| Jun 3, 2019 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL, WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM | Jul 1, 2019 |
| Jun 3, 2019 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 3rd STORY, 1st APAR | Jul 1, 2019 |
| Jun 3, 2019 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WE | Jul 1, 2019 |
| Sep 4, 2018 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 2, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:48 PM ET. BBL 3006850008.