2 floors · 1 apartments · 2,000 sq ft · built 1920 · class S1 · owner of record: Rr Wilson 2025 Family Trust
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page | Dec 31, 2026 in 57 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 301 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 18 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1153 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 5, 1989 | Construction Non-Hazardous WORK WITHOUT A PERMIT. REMEDY: STOP ALL WORK. OBTAIN A PERMIT. #34028639R | Oct 23, 1989 WRITTEN OFF | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 12, 2008 | C | Apt 1 · D26-17.07 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 1 STY APT 1 KITCHEN & BATHROOM. LOCATED AT APT 1 | Jun 18, 2008 |
| Jun 12, 2008 | C | D26-17.10 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDING'S HEATING SYSTEM 1 STY PUBLIC HALL & ON BOILER ROOM DOOR. | Jun 18, 2008 |
| Jun 12, 2008 | C | D26-17.10 ADM CODE PROVIDE READY ACCESS TO BUILDING'S HEATING SYSTEM CELLAR DOOR LOCKED. | Jun 18, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF DROP CEILING INSTALLED REAR ROOM, 1ST STORY APT. 1. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING OF REAR WEST ROOM 1ST STORY APT. REAR. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN KITCHEN SINK-1 STY. APT. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2026 ADMIN. CODE: REPAIR BY CLOSING SO AS TO BE GAS TIGHT ALL OPENINGS IN THE DRAIN PIPE UNDER KITCHEN SINK-1 STY. APT. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING OF KITCHEN -1 STY . APT. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEIILNG REAR ROOM 1 STY. APT. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING SOUTHWEST ROOM 1 STY-APT 1. | Jul 17, 2008 |
| Jun 12, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ACOUSTICAL TILES CEILING KITCHEN 1ST STORY APT 1. | Jul 17, 2008 |
| Jun 12, 2008 | A | SECTION 27-2041 ADMIN. CODE: PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED AS TO PERMIT A PERSON INSIDE THE DWELLING UNIT TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR 1ST STORY APT 1. | Sep 15, 2008 |
| Jun 12, 2008 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING VESTIBULE AND 1ST STORY PUBLIC HALL. | Sep 15, 2008 |
| Jul 3, 2006 | C | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING BATHROOM, 1ST STORY APT. 1. | Jul 21, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING BATHROOM,1ST STORY REAR APT. | Aug 19, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 3:50 AM ET. BBL 3080090032.