7 floors · 119 apartments · 58,625 sq ft · built 1927 · class I7 · owner of record: Hillside Avenue Development, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $197,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 117 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 58,625 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9764). Agency page | Dec 31, 2034 in 2987 days | Next due 2034 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-09 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2025 | Construction CLASS - 2 OBSERVED LACK SPRINKLER COVERAGE IN LOBBY, LUNCHROOM, KITCHEN AND STAIRCASE GOING TO THE ROOF. ALSO, IN BASEMENT LACK SUPPORT ON GAS LINE WHICH IS CONTRARY TO CODES SECTIONS FGC 407.2 AND BC 403.3, REPAIR AND/O #39161595Z | Nov 24, 2026 DEFAULT | $1,280 |
| Sep 25, 2025 | Elevators CLASS - 2 CLASS 2 ITEMS: CAT 1 TAG MISSING, PROVIDE UPDATED TAG. LANDING SIGNS (BRAILLE TAGS) MISSING IN THE BASEMENT, PROVIDE AS NEEDED. UP DIRECTION HALL BUTTON IN THE LOBBY JAMS IN WHEN PRESSED, REPAIR. LOBBY UP DIREC #39161586R | Jan 20, 2026 IN VIOLATION | $625 |
| Sep 25, 2025 | Elevators CLASS - 2 CLASS 2 ITEMS: RETAINER (Z)-BRACKET MISSING ON THE LOBBY DOOR, INSTALL. CAT 1 TAG MISSING, PROVIDE UPDATED TAG. LANDING SIGNS (BRAILLE TAGS) MISSING IN THE BASEMENT, PROVIDE AS NEEDED. UP DIRECTION HALL BUTTON #39161587Z | Jan 20, 2026 IN VIOLATION | $625 |
| Apr 12, 2022 | Construction CLASS - 1 AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BOILER ROOM OFF THE BOILER A TEE WITH A PLUG ON THE GAS PIPING, THAT IS A FUTURE CONNECTION AND NOT CODE COMPLIANT., REPAIR AND/REPLACE #39060062N | May 31, 2022 ADMIT/IN-VIO | $0 |
| Sep 23, 2021 | Boilers CLASS - 2 CHIMNEY BASE 1/2 FULL/DISCHARGE PIPE MISSING AT SAFETY VALVE BODY DRAIN/FRESH AIR 1/2 BLOCKED;CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF CORRECTION #39048021P | May 24, 2022 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 29, 2026 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY | Oct 2, 2026 |
| Jun 29, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY | Oct 2, 2026 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 2:32 PM ET. BBL 4097640091.