3 floors · 150,000 sq ft · built 1963 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-11 (Accepted). Agency page | Dec 31, 2026 in 44 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 150,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 11403). Agency page | Dec 31, 2033 in 2601 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 16, 2026 | Construction CLASS - 2 REISSUED ECB #35691789J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT GYM BAD WALL APPROX. 10' STEP CRACK ON CMU BLOCKS. REMEDY: REPAIR AND/OR REPLACE. #35732212N | May 13, 2026 POP/IN-VIO | $0 |
| Apr 16, 2026 | Construction CLASS - 2 REISSUED ECB #35691788H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORSPER BC 1006.1; 27-381. NOTED SEVERAL EMERGENCY LIGHTS NOT WORKING THRO #35732213P | May 13, 2026 POP/IN-VIO | $0 |
| Apr 16, 2026 | Construction CLASS - 2 28-301.1. REISSUED ECB #35691787X. FAILURE TO PROVIDE NATURAL OR MECHANICAL VENTILATION TO OCCUPIED SPACES PER MC 401.2. NOTED AT ROOMS #216, B15, B 33, 131 AND 336 NO WINDOWS AND NO MECHANICAL VENTILATION. REM #35732214R | May 13, 2026 POP/IN-VIO | $0 |
| Apr 15, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: APPROX. 25 EMERGENCY LIGTS NOT WORKING THROUGHOUT THE SCHOOL LIB #35691788H | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 15, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED ON APPROX. 10' STEP CRACK IN GYMNASIUM CMU BLOCK WALL ALONG THE WINDOWS. REMEDY: REPAIR AND/OR REPLACE. #35691789J | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 15, 2025 | Construction CLASS - 2 28-301.1. REISSUE #35678865X. FAILURE TO PROVIDE NATURAL OR MECHANICALVENTILATION TO OCCUPIED SPACES PER MC 401.2. NOTED ROOMS #216, 131, B15, B33, BA AND BB OCCUPIED WITHOUT PROPER VENTILATION. OFFICE AND MEET #35691787X | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 18, 2024 | Construction CLASS - 2 28-301.1. REISSUE 35672983J. FAILURE TO PROVIDE NATURAL OR MECHANICAL VENTILATION TO OCCUPIED SPACES PER MC 401.2. ROOMS BB, BA, B36, B33, B15, 131, 216 ALL OCCUPIED WITHOUT PROPER VENTILATION INTO THE SPACES. #35678865X | Jun 20, 2024 POP/IN-VIO | $0 |
| Apr 18, 2024 | Construction CLASS - 2 REISSUE 35672980Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ROOM 131, 216, 336 OFFICES, PROVIDE MECHANICAL VENTILATION IN OCCUPIED SPACE. REMEDY: REPAIR AND/OR REPLACE. #35678866H | Jun 20, 2024 POP/IN-VIO | $0 |
| May 1, 2023 | Construction CLASS - 2 28-301.1 REISSUE#35491068N(4/22/2020)FAILURE TO PROVIDE NATURAL OR MECHANICAL VENTILATION TO OCCUPIED SPACES PER BC 401.2 AT ROOM BB,BA,B36,B33,B15,131,216 ALL OCCUPIED WITHOUT A PROPER VENTILATION INTO THE OCC #35672982H | Aug 1, 2023 POP/IN-VIO | $0 |
| May 1, 2023 | Construction CLASS - 2 REISSUE#35654929J(4/18/22)FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:NO MECHANICAL VENTILATION IN ROOM 131,216,336 OFFICES.REM:PROVIDE MECHANICAL VENTILATION IN OCCUPIED SPACE. #35672980Y | Aug 1, 2023 POP/IN-VIO | $0 |
| Apr 14, 2023 | Unknown CLASS - 3 AT THE TIME OF INSPECTION I OBSERVED INSTALLATION OF 4 A/C CONDENSERS MOUNTED ON THE REAR OF THE SCHOOL NO APPLICATION ON FILE WITH D.O.B., OBTAIN PERMIT #39083805R | Apr 27, 2023 POP/IN-VIO | $0 |
| Apr 18, 2022 | Construction CLASS - 2 REISSUE#35555756R.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED NO VENTILATION IN ROOMS 216,131,336.THESE ROOMS ARE OCCUUPIED AS OFFICES.REMEDY:REPAIR AND REPLACE. #35654929J | Jul 26, 2022 POP/IN-VIO | $0 |
| Mar 18, 2021 | Construction CLASS - 2 REISSUE34927639X FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NO VENTILATION IN RMS216,131,B36,B15,BA,BB.RMS OCCUPIED AS OFFICES.COMPLY W/CODE. #35555756R | Jun 15, 2021 POP/IN-VIO | $0 |
| Apr 22, 2020 | Construction CLASS - 2 SEC. 28-301.1 MISC VIOLATIONS/REISSUE#35402503L FAILURE TO PROVIDE NATURAL OR MECHANICAL VENTILATION TO OCCUPIED SPACES PER MC 401.2. NOTED:OBSERVED ROOMS 216,131,B15,B33,B36,BA,BB BEING OCCUPIED AS OFFICES AND #35491068N | Aug 18, 2020 POP/IN-VIO | $0 |
| Apr 8, 2019 | Construction CLASS - 2 BC28-301.1.REISSUE #35316706K FAILURE TO PROVIDE NATURAL OR MECHANICALVENTILATION TO OCCUPIED SPALCES PER MC 401.2.NOTED:THE FOLLOWING ROOMSOCCUPIED AS OFFICE AND MEETING ROOMS HAVE NO NATURAL OR MECHANICAL VEN #35402503L | Jul 9, 2019 POP/IN-VIO | $0 |
| Feb 14, 2018 | Construction CLASS - 2 28-301.1 REISSUE 35235205H FAILURE TO PROVIDE NATURAL OR MECHANICAL VENTILATION TO OCCUPIED SPACES PER MC 401.2. NOTED: OBSERVED IN MULTI PLE ROOMS 216,131,B15,B33,B36,BA, AND BB, HAVE NO MECHANICAL VENTILA #35316706K | May 29, 2018 POP/IN-VIO | $0 |
| Mar 28, 2017 | Construction CLASS - 2 REISSUE #35094319J. MISC VIOLATION: NOTED AT TIME OF INSPECTION OBSERVED NO MECHANICAL VENTILATION TO OCCUPIED ROOMS, MULTIPLE ROOMS 216, 131,B15,B33,B56,BA AND BB ADJACENT TO CAFETERIA ENTRANCE PROVIDE MECHA #35235205H | May 16, 2017 POP/IN-VIO | $0 |
| May 13, 2014 | Unknown CLASS - 2 RE-ISSUE # 34981679H. 27-765. FAILURE TO PROVIDE MECHANICAL VENTILATION TO OCCUPIED ROOMS, MULTIPLE ROOMS 216,131,B15,B33,B36,BA & BB ADJACENT TO CAFETERIA ENTRANCE. REMEDY: PROVIDE MECHANICAL VENTILAITON OR DI #35094319J | Jul 29, 2014 POP/IN-VIO | $0 |
| May 22, 2012 | Unknown CLASS - 2 REISSUE#34927639X NO VENTILATION PROVIDED FOR ROOMS 216,131,B15,B36,BA,&BB ROOMS OCCUPIED AS OFFICE & MEETING ROOMS.REM:PROVIDE VENTILATION. #34981679H | Aug 14, 2012 POP/IN-VIO | $0 |
| Oct 5, 2011 | Construction CLASS - 2 NO VENTILATION INTO RMS 216,131,B36,B15,BA,BB, ROOMS OCCUPIED AS OFFICES, MEETING ROOMS. REMEDY: PROVIDE VENTILATION. #34927639X | Dec 6, 2011 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17095 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17096 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17097 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #07591 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #07592 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:27 PM ET. BBL 4114030001.