Queens · Block 9764 · Lot 1 · 11421

88-13 Parsons Boulevard

3 floors · 74,973 sq ft · built 1931 · class M1 · owner of record: Ch Presentation B V M

19open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
59dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 59 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 59 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 74,973 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 180 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 180 days
Annual filing
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9764). Agency page

Dec 31, 2034
in 2981 days
Next due 2034
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (13)
IssuedViolationHearingBalance
Jun 10, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT EXPOSURE#1 WIRE MESH GLASS PANELS FOR VISION PANEL OR SIDE LIGHT ON SMOKE FIRE RATED DOOR WAS CRACKED AT MAIN ENTRANCE EXTERIOR EMERGENCY EXIT DOOR
#35734258H
Jul 20, 2026
POP/IN-VIO
$0
Jun 10, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING PROPERTY DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 303,317,314,214,217,204,104
#35734259J
Jul 20, 2026
POP/IN-VIO
$0
Sep 25, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: CRACKS AND CHIPPED BRICK FACES ABOVE EXIT #6, EXP #9 MASONRY FACADE. REMEDY: REPAIR AND/OR REPLACE.
#35725487R
Oct 23, 2025
POP/IN-VIO
$0
Feb 8, 2019Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED:OBSERVED AT BOTH ROOF LEVELS,LOOSE,MISSING CEMENT MORTAR OF BRICK JOINTS,HORIZONTAL CRACKS,AND SEPARATION UNDER COPING STONES AT VARIOUS LOCATIONS TH
#35379819P
Apr 17, 2019
IN VIOLATION
$0
Jul 18, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTED:AT 2ND AND 3RD STORY ROOFS,ALL EXPOSURES COPING STONES ARE SHIFTING IN VARIOUS LOCATIONS THROUGHOUT BOTH ROOFS.ALSO AT 2ND AND 3RD STORY ROOFS,BRICKS,A
#35342159J
Sep 4, 2018
IN VIOLATION
$0
Oct 31, 2017Construction CLASS - 1
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1;28-118.3.2. NOTED: C OF O#Q000165485 INDICATES THE PREMISES BOILER ROOM,KITCHEN,DINING PARLOR,CHAPEL,CELLS,COMMUNITY ROOM. OBSERVED AT THE TIME
#35294567P
Feb 9, 2018
IN VIOLATION
$0
Jul 31, 2017Construction CLASS - 1
ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 AND 28-118.3.2.NOTED:COFO 3000165485 INDICATES THAT THE PREMISES,BOILER ROOM,KITCHEN,DINING PARLOUR,CHAPEL CELLS COMM
#35286802X
Oct 31, 2017
IN VIOLATION
$0
Jul 12, 2017Construction CLASS - 2
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: OBSERVED ON THE ROOF LEVEL(UPPER & LOWER ROOFS)AT EXP#1,2,3,4 STEP CRACKS IN BRICKS THROUGHOUT PARAPET WALL LOOSE COPING STONES MISSING MORTAR AT JOINTS,
#35272325P
Aug 29, 2017
IN VIOLATION
$0
Jun 7, 2017Construction CLASS - 1
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3;28-118.3.2. NOTED: C OF O Q000165485 INDICATES THE PREMISES,BOILER ROOM,KITCHEN,DINING PARLOUR,CHAPEL,CELLS,COMMUNITY ROOM. OBSERVED AT THE TIME
#35267767X
Jul 25, 2017
IN VIOLATION
$0
Apr 5, 2017Construction CLASS - 1
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.1;28-118.3.21. NOTED: C OF O Q000165485 INDICATES THE PREMISES,BOILER ROOM,KITCHEN,DINING PARLOUR,CHAPEL,CELLS,COMMUNITY ROOM,OBSERVED AT THE TIME
#35229022Y
May 23, 2017
IN VIOLATION
$0
Feb 9, 2017Construction CLASS - 1
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1;28-118.3.2. NOTED: C OF C Q000165485 INDICATES THE PREMISES BOILER ROOM,KITCHEN,DINING PARLOR,CHAPEL,CELLS,COMMUNITY ROOM,OBSERVED AT THE TIME
#35226580P
Jul 18, 2017
IN VIOLATION
$0
Jan 11, 2017Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.NOTE: CO#165485 INDICATES 2ND FL TO BE CELLS INFIRMARY. COMMUNITY ROOM& 3RD FL CELLS,ROOF TERRANCE. OBSERVED 2ND FL NOW OCCUPIED AS HOMELESS
#35225626R
May 2, 2017
IN VIOLATION
$0
Oct 26, 2016Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O OR BLDG DEPT RECORDS. NOTED: 2ND & 3RD FL BEING USED AS SHELTER (HOMELESS SHELTER) WHILE CO#+165485 STATES THAT 2ND FL HAS (10) CELLAR & 3RD FL HAS 8 CELLAR OCCUPIED
#35213940R
May 2, 2017
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#28864
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#29340
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Mar 19, 2003Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
May 6, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 9, 2026

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 2, 2026, 12:30 AM ET. BBL 4097640001.

Look up another building