3 floors · 3 apartments · 2,536 sq ft · built 1970 · class C0 · owner of record: Winston Kirton
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 21, 1999 | ZONING #17H01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 19, 2026 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Sep 21, 2026 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2026 |
| Sep 21, 2026 | B | Apt 3 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASHBASIN WASTELINE IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT CLOSET IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUT | Sep 9, 2026 |
| Aug 5, 2026 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Apr 22, 2026 | C | Apt 3 · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 28, 2026 |
| Apr 9, 2026 | B | Apt 3 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 14, 2026 |
| Feb 19, 2026 | C | Apt 3 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM EAST LOCATED AT APT 3 UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 19, 2026 |
| Dec 2, 2025 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 6, 2026 |
| Dec 2, 2025 | C | Apt 3 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 29, 2025 |
| Dec 2, 2025 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 6, 2026 |
| Oct 30, 2025 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 4, 2025 |
| Oct 30, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 4, 2025 |
| Oct 30, 2025 | B | Apt 3 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 4, 2025 |
| May 21, 2025 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 16, 2025 |
| May 21, 2025 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS NEAR SKYLIGHT IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 25, 2025 |
| May 21, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 25, 2025 |
| May 21, 2025 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 16, 2025 |
| May 19, 2025 | B | Apt 3 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2025 |
| May 19, 2025 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2025 |
| Apr 14, 2025 | C | Apt 3 · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOTWATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 20, 2025 |
| Apr 14, 2025 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 19, 2025 |
| Apr 14, 2025 | B | Apt 3 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 19, 2025 |
| Oct 29, 2024 | B | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 FEET AT CEING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17085308 ISSUED 30-JUN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CO | Dec 3, 2024 |
| Jul 1, 2024 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 5, 2024 |
| Jul 1, 2024 | A | Apt 3 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 4, 2024 |
| Jul 1, 2024 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 5, 2024 |
| Jul 1, 2024 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 27, 2024 |
| May 6, 2019 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, APARTMENT AT SOUTH | Jun 10, 2019 |
| May 6, 2019 | B | Apt 3FL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, APARTMENT AT SOUTH | Jun 10, 2019 |
| May 6, 2019 | B | Apt 3FL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 3FL, 3rd STORY, APARTMENT AT SOUTH | Jun 10, 2019 |
| May 6, 2019 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SCUTTLE LADDER AT PUBLIC HALL, 3rd STORY | Jun 10, 2019 |
| May 6, 2019 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE, FURNITURE AND ELECTRONICS AT PUBLIC HALL, 1st STORY | Jun 10, 2019 |
| May 6, 2019 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, APARTMENT AT SOUTH | Jun 10, 2019 |
| May 6, 2019 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF SHOE SHELVES AT PUBLIC HALL, 3rd STORY | Jun 10, 2019 |
| May 6, 2019 | B | Apt 3FL · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, APARTMENT AT SOUTH | Jun 10, 2019 |
| Jan 3, 2017 | C | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE BOARD RADIATOR THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY | Jan 11, 2017 |
| Jan 3, 2017 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER INTERCOM/SYSTEM FROM 1ST. STORY PUBLIC HALL VESTIBULE TO IN THE FOYER LOCATED AT APT 3FL, 3rd STORY | Feb 7, 2017 |
| Jan 3, 2017 | A | Apt 3FL · § 27-2005 ADMIN. CODE: PROVIDE A PROPER SEAT FOR WATER CLOSET , IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY | Apr 8, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 21, 2026 | HPD B | § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASHBASIN WASTELINE IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT CLOSET IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 5, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUT | Open |
| Aug 5, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 9:40 PM ET. BBL 3048780053.