4 floors · 16 apartments · 14,280 sq ft · built 1916 · class C1 · owner of record: 8757 Bay 16 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 6, 2025 | Construction CLASS - 2 NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY VIO 39103426M ISSUED ON 1/12/24. EGRESS IS CLEAR AS OF 6/6/25., FILE A CERTIFICATE OF CORRECTION #39150227L | Sep 15, 2025 IN VIOLATION | $1,250 |
| Feb 11, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39110899H ISSUED ON 04/05/2024, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37033364M | Apr 9, 2026 DEFAULT | $6,250 |
| Apr 5, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED EXP#1 FACADE WALL HAVE CRACK AND MISSING MORTAR JOINT. AT EXP#2 STUCCO MISSING AT MULTIPLE LOCATIONS EXPOSED DAMAGED BRICKS AND ALSO CRACK., MAINTAIN EXTERIOR BUILDING WALL #39110899H | Jun 12, 2024 STIPULATION/IN-VIO | $630 |
| Aug 4, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39042598M ISSUED ON 6/10/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMM #35534496R | Jun 22, 2022 IN VIOLATION | $1,250 |
| Jun 10, 2021 | Construction CLASS - 1 AT ROOF LEVEL AT EXPOSURE 1, SECTION OF ORNAMENTAL STONE PARAPET CAPPING HAS DETACHED AND FALLEN TO GRADE, ALSO NOTED AT ROOF LEVEL, STUCCO FINISH OF PARAPET WALL AT FRONT HAS SEPARATED FROM WALL. OBSERVED STEP #39042598M | Apr 11, 2022 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 1, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00366 | DOB VIOLATION - ACTIVE |
| Jun 10, 2021 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED AT ROOF LEVEL AT FRONT OF BUILDING, SECTION OF STONE ORNAMENTAL COPING MISSING AND HAS FALLEN ONTO GRADE. STUCCO FINISH OF PARAPET DETACHING AT FRONT WALL, STEP CRACKS ABOVE 1ST FLOOR WINDOW AT LEFT SIDE. #21-00575 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #07531 | DOB VIOLATION - ACTIVE |
| Sep 13, 2011 | CONSTRUCTION #CN1103MM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 1, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 28, 2024 | C | Apt D1 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 11, 2024 |
| Feb 5, 2024 | C | Apt B3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 2, 2024 |
| Jan 18, 2024 | C | Apt C3 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Feb 11, 2024 |
| Aug 23, 2023 | C | Apt B3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 18, 2023 |
| Oct 4, 2021 | C | Apt B3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 30, 2021 |
| Nov 25, 2019 | B | Apt A4 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT STEAM RISER IN THE 1st ROOM FROM EAST LOCATED AT APT A4, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 30, 2019 |
| Aug 7, 2019 | B | Apt A3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 11, 2019 |
| Mar 15, 2019 | C | Apt D2 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT D2, 4th STORY, 2nd APA | Apr 12, 2019 |
| Mar 7, 2019 | C | Apt D2 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT D2, 4th STORY, 2nd APA | Apr 4, 2019 |
| May 29, 2018 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT THE FIRE ESCAPE AT THE REAR YARD | Sep 1, 2018 |
| Dec 30, 2015 | C | Apt D2 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 2; WG TO REPA INPROPERLY INSTALLED WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCAT | Jan 27, 2016 |
| Feb 21, 1995 | C | Apt 3D · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WALL AND CEILING SOUTHEAST ROOM 4 STY SOUTHEAST APT 3D ER1 95003348. , SECTION '' '' | Mar 13, 1995 |
| May 29, 1990 | C | Apt D2 · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT STEAM RISER 4 STY NORTHWEST APT D2 BATHROOM CRUZ NO PHONE ER1. LOCATED AT APT D2 | Jun 18, 1990 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:33 AM ET. BBL 3064010011.