2 floors · 2 apartments · 2,052 sq ft · built 1960 · class B9 · owner of record: Zhang, Chunquan
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 17, 2025 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HANDRAIL AT STAIRS AT FRONT OF BUILDING | Dec 22, 2025 |
| Nov 17, 2025 | B | Apt 2ND · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2ND, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2025 |
| Nov 17, 2025 | B | Apt 2ND · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2ND, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2025 |
| Nov 17, 2025 | B | Apt 2ND · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2ND, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2025 |
| Nov 17, 2025 | C | Apt 2ND · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING ALLOWABLE TEMP OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 2ND, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 23, 2025 |
| Oct 27, 2025 | C | Apt 2NDFLO · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 27, 2025 |
| May 16, 2025 | C | Apt 2FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FEET AT THE CEILING IN THE 1st BATHROOM FROM NORTH AT WEST LOCATED AT APT 2FL, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 11, 2025 |
| May 16, 2025 | B | Apt 2FL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING, IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 20, 2025 |
| May 1, 2025 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 5, 2025 |
| May 1, 2025 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 5, 2025 |
| May 1, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AND MISSING GARBAGE DOOR, AT 1st GARAGE FROM EAST | Jun 5, 2025 |
| May 1, 2025 | C | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT 2 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 27, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:48 AM ET. BBL 3068780076.