3 floors · 2 apartments · 4,946 sq ft · built 1931 · class S9 · owner of record: Alsaedi, Ahmed A
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 71 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 315 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 802 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 4, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO24-00022 IN CONNECTION WITH 39102764K., COMPLY WITH COMMISSIONER'S ORDER #39203170X | Nov 18, 2026 PENDING | $2,500 |
| Apr 3, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NOTED: FACADE REPAIRS AND PARAPET WALL WERE ALTERED IN A WAY THAT REQUIRE PERMITS- NO PERMITS ON FILE., OBTAIN PERMIT #39183178P | Jun 10, 2026 DEFAULT | $12,500 |
| Apr 1, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS # 39102764K., FILE A CERTIFICATE OF CORRECTION #39182878L | Jun 10, 2026 DEFAULT | $6,250 |
| Dec 4, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS # 39102891N., FILE A CERTIFICATE OF CORRECTION #39169299K | Feb 11, 2026 DEFAULT | $6,250 |
| Jan 4, 2024 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED FACADE AT EXP# 1 AND 2 IN STATE OF DISREPAIR. CRACKS AND STUCCO DISPLACED AT EXP#2 AT MULTIPLE LOCATIONS AND IN DANGER TO FUTURE COLLAPSE., AT EXP#1 PARAPET WALL LEANING INWARD, B #39102764K | Mar 13, 2024 DEFAULT | $12,500 |
| Jan 4, 2024 | Construction CLASS - 1 OBSERVED FACADE AT EXP# 1 AND 2 IN STATE OF DISREPAIR. CRACKS AND STUCCO DISPLACED AT EXP#2 AT MULTIPLE LOCATIONS AND IN DANGER TO FUTURE COLLAPSE., AT EXP#1 PARAPET WALL LEANING INWARD, BRICKS DAMAGED AT ROOF #39102891N | Mar 13, 2024 DEFAULT | $12,500 |
| Mar 2, 2018 | Construction CLASS - 2 ERECT ILLUMINATED WRAP-AROUND SIGN, APPRX 18' ALONG LEWIS AVENUE AND 20' ALONG BROADWAY; WITH WORDING "874 BROADWAY DELI AND GRILLE". WORK DONE W/O A PERMIT. RMDY: COMPLY WITH NOTICE OF VIOLATION. #35316673N | Apr 23, 2018 WRITTEN OFF | $0 |
| Jan 2, 2007 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR NOTED: SOUTH WALL SIGN APPROX 12' ON ROOF, BROKEN & HANGING TOWARDS SIDEWALK IN DANGER OF FALLING CREATING HAZARD TO PEDESTRIANS BELOW ON LEWIS AVE. ALSO NOTED: TRAIN ENTRANCE A BUS #34556422P | Mar 26, 2008 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #15084 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #13802 | DOB VIOLATION - ACTIVE |
| Jan 4, 2024 | CONSTRUCTION OBSERVED FACADE AT EXP# 1 AND 2 IN STATE OF DISREPAIR. CRACKS AND STUCCO DISPLACED AT EXP#2 AT MULTIPLE LOCATIONS AND IN DANGER TO FUTURE COLLAPSE., AT EXP#1 PARAPET WALL LEANING INWARD, BRICKS DAMAGED AT ROOF LEVEL, WALL BULGING. #24-00037 | DOB VIOLATION - ACTIVE |
| Jan 4, 2024 | CONSTRUCTION OBSERVED FACADE AT EXP# 1 AND 2 IN STATE OF DISREPAIR. CRACKS AND STUCCO DISPLACED AT EXP#2 AT MULTIPLE LOCATIONS AND IN DANGER TO FUTURE COLLAPSE., AT EXP#1 PARAPET WALL LEANING INWARD, BRICKS DAMAGED AT ROOF LEVEL, WALL BULGING. #24-00022 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #31715 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #11295 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #32032 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #10262 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #17745 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 18, 2020 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FEET AT SOUTH WALL ,5 SQ FEET AT CEILING AT PUBLIC HALL, 2nd STORY ORIGINAL VIOLATION 13346821 ISSUED 19-OCT-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Mar 24, 2020 |
| Oct 21, 2019 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND ALL WALLS AT PUBLIC HALL, 2nd STORY | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK FROM CEILING TO SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | C | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 11, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND ALL WALLS AT CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | A | Apt 2 · § 27-2005 ADMIN. CODE: REFIT THE CLOSET DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 24, 2020 |
| Oct 21, 2019 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK FROM CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE EAST WALL UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2019 |
| Oct 21, 2019 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FEET AT CEILING, 20 SQ FEET AT NORTH WALL AND 10 SQ FEET AT WEST WALL AT PUBLIC HALL, 1st STORY | Nov 25, 2019 |
| Oct 21, 2019 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK FROM CEILING TO ALL WALLS AT PUBLIC HALL, 1st STORY | Nov 25, 2019 |
| Oct 21, 2019 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND ALL WALLS AT PUBLIC HALL, 1st STORY | Nov 25, 2019 |
| Oct 21, 2019 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Oct 29, 2019 |
| Oct 21, 2019 | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT PUBLIC HALL, 2nd STORY | Nov 25, 2019 |
| Aug 13, 2009 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 3RD STY. APT. 2. THROUGHOUT. | Sep 17, 2009 |
| Aug 13, 2009 | C | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM, 3RD STORY APT. 2. ER1. | Aug 19, 2009 |
| Aug 13, 2009 | C | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING SOUTHWEST ROOM, 3RD STY. APT. 2. | Aug 19, 2009 |
| Aug 13, 2009 | B | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE HOT WATER AT KITCHEN SINK, 3RD STY. APT. 2. | Sep 17, 2009 |
| Aug 13, 2009 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ALL TREADS, 1ST TO 2ND TO 3RD STY. PUBLIC HALL. | Sep 17, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 4, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO24-00022 IN CONNECTION WITH 39102764K., COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 21, 2026, 11:07 PM ET. BBL 3015820009.