Brooklyn · Block 6417 · Lot 57 · 11214

8714 23 Avenue

2 floors · 4 apartments · 3,402 sq ft · built 1925 · class C3 · owner of record: Davi, Francesca

10open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
64dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Feb 8, 2007Construction Non-Hazardous
WORK W/O A PERMIT.NOTED:A CURB CUT 10FT. WIDE LEADING TO A PAVED FRONT YARD 17'-6"X9'-0"ARE BUILT ILLEGALY AT FRONT NORTH PART OF THE PROPERTY.PAVED FRONT YARD HAS NO DRAIN & SLOPED TOWARD THE PUBLIC SIDE WALK
#34555264Y
Apr 30, 2007
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
HPD (8) · C 7 · B 0 · A 1
IssuedClassViolationCorrect by
Sep 4, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BUILDING ENTRANCE DOOR AT NORTH , 1st STORYSep 18, 2025
Sep 4, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE THE BUILDING ENTRANCE DOOR AT SOUTH , 1st STORYSep 18, 2025
Jan 30, 2020CApt 1F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2020
Jan 30, 2020CApt 1R · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTHFeb 5, 2020
Jan 30, 2020CApt 2R · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 5, 2020
Jan 30, 2020C§ 27-2056.4 ADM CODE- Correct failure to notify occupants and/or to investigate lead-based paint hazards.Feb 5, 2020
Jan 21, 2020CApt F2 · § 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to Local Law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.Jan 27, 2020
Sep 16, 2019A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.Dec 20, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 12:48 PM ET. BBL 3064170057.

Look up another building