6 floors · 174 apartments · 222,787 sq ft · built 1932 · class D4 · owner of record: Shoretown Mgmt Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 222,787 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6040). Agency page | Dec 31, 2030 in 1529 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 17, 2021 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.NO OVERHEAD PROTECTION WHERE ACCESSIBLE BY BUILDING OCCUPANTS NOTE:OBSERVED PARAPET CLAMPS IN PLACE AT ROOF LEVEL WITHOUT BEDDING #35547247Z | Jul 28, 2021 IN VIOLATION | $1,204 |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2003809 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01254 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01254 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST #03547 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR DOOR AT PUBLIC HALL, 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Nov 2, 2026 |
| Oct 19, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL, SOUTH WALL AND CEILING AT BULKHEAD , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Nov 23, 2026 |
| Oct 19, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, SOUTH WALL AND CEILING AT BULKHEAD , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Jan 22, 2027 |
| Oct 19, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Nov 2, 2026 |
| Sep 25, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND SOUTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''1'' | Dec 29, 2026 |
| Sep 25, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND SOUTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''1'' | Oct 30, 2026 |
| Aug 31, 2026 | B | Apt 612 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 31, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 6th STORY | Oct 5, 2026 |
| Aug 31, 2026 | C | Apt 612 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 14, 2026 |
| Aug 31, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 6th STORY | Dec 4, 2026 |
| Aug 31, 2026 | A | Apt 612 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2026 |
| Aug 31, 2026 | B | Apt 612 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AND CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| May 6, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BASEMENT FIRE DOOR LEADING FROM BUILDING2 TO BUILDING 1 LOCATED AT PUBLIC PARTS, SECTION ''BLDG 2'' | May 20, 2025 |
| May 6, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ..HINGES AT BASEMENT AT COMPACTOR CLOSET, SECTION ''BLDG 1'' | May 20, 2025 |
| May 6, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BASEMENT FIRE DOOR LEADING FROM BUILDING 1 TO BUILDING 2 LOCATED AT PUBLIC PARTS, SECTION ''BLDG 1'' | May 20, 2025 |
| Apr 16, 2025 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AROUND STAND UP SHOWER FLOOR AND ALL WALL IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''3'' | May 21, 2025 |
| Apr 16, 2025 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR AT AND STAND UP SHOWER AND WEST WALL IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''3'' | May 21, 2025 |
| Apr 16, 2025 | B | Apt 335 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW COUNTER BALANCE LOWER SASH AT SOUTH IN THE 2nd ROOM FROM EAST LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''3'' | May 21, 2025 |
| Apr 16, 2025 | B | Apt 335 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW COUNTER BALANCE LOWER SASH AT SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''3'' | May 21, 2025 |
| May 16, 2024 | C | Apt 335 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 34 SQUARE FEET AT CAULKING, GRUOTS JOINTS OF THE CEILING , SOUTH ,WEST , NORTH AND EAST ,IN THE SHOWER STALL , IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION | Jun 11, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY CEMENTS AND CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT THE WEST WALL, IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL, IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SHOWER BODY IN THE SHOWER STALLL, IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VANITY TOP OF THE WASHBASIN AT WEST WALL, IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| May 16, 2024 | B | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SEALER CAULKING AROUND THE ALUMINUM SREEN DOOR FRAME AT THE ENTRANCE TO THE SHOWERSTALL, IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NO-3'', 1st FROM NORTH AT EAST | Jun 20, 2024 |
| Jan 2, 2024 | B | Apt 335 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''3'' | Feb 6, 2024 |
| Jan 2, 2024 | B | Apt 335 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''3'' | Feb 6, 2024 |
| Jan 2, 2024 | A | Apt 335 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TILE GROUT AT WEST WALL, NORTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 335, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''3'' | Apr 6, 2024 |
| Dec 8, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE [LATCH SET] AND [ HINGES SPRINGS] AT ENTRANCE , AT COMPACTOR CLOSET, 3rd STORY, SECTION ''BLDG-2'', 2nd FROM WEST AT NORTH | Dec 22, 2023 |
| Oct 23, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT BULKHEAD , SECTION ''SECTION 3'' | Nov 27, 2023 |
| Oct 23, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD TO ROOF , SECTION ''SECTION 3'' | Nov 6, 2023 |
| Jul 12, 2022 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT NORTH 2 FIRE ESCAPE AT INTERIOR COURT YARD , 3rd STORY | Aug 16, 2022 |
| May 18, 2022 | B | Apt 322 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... [ APPROX-1 SQ,FT ] AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14771356 ISSUED 13-JAN-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27- | Jun 22, 2022 |
| Jan 18, 2022 | B | Apt 322 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Feb 22, 2022 |
| Jan 18, 2022 | A | Apt 322 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 23, 2022 |
| Jan 18, 2022 | A | Apt 322 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 23, 2022 |
| Jan 18, 2022 | B | Apt 322 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE [ INOPERATIVE ] ELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Feb 22, 2022 |
| Jan 18, 2022 | B | Apt 322 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Feb 22, 2022 |
| Jan 18, 2022 | A | Apt 322 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 23, 2022 |
| Jan 18, 2022 | A | Apt 322 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 322, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 23, 2022 |
| Jan 17, 2020 | A | Apt 322 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 322, 3rd STORY, APARTMENT AT EAST | Apr 21, 2020 |
| Jan 17, 2020 | A | Apt 322 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUT LET EAST WALL IN THE KITCHEN LOCATED AT APT 322, 3rd STORY, APARTMENT AT EAST | Apr 21, 2020 |
| Jan 17, 2020 | A | Apt 322 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RECAULK AROUND WASHBASIN IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Apr 21, 2020 |
| Jan 17, 2020 | A | Apt 322 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT CERAMIC TILE NORTH WALL AT BATHTUB IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Apr 21, 2020 |
| Jan 17, 2020 | A | Apt 322 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 322, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Apr 21, 2020 |
| Jan 15, 2020 | A | Apt 322 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 322, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Apr 19, 2020 |
| Jan 15, 2020 | A | Apt 322 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR GASKET AT REFRIGERATOR IN THE KITCHEN LOCATED AT APT 322, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Apr 19, 2020 |
| May 2, 2019 | B | Apt 123 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE FOYER LOCATED AT APT 123, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 6, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR DOOR AT PUBLIC HALL, 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL, SOUTH WALL AND CEILING AT BULKHEAD , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Open |
| Oct 19, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, SOUTH WALL AND CEILING AT BULKHEAD , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Open |
| Oct 19, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR , 6th STORY, SECTION ''1'', 1st FROM EAST AT SOUTH | Open |
| Sep 25, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR AT COMPACTOR CLOSET, 6th STORY, SECTION ''1'' | Closed |
| Sep 25, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR AT COMPACTOR CLOSET, 1st STORY, SECTION ''1'' | Closed |
| Sep 25, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND SOUTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''1'' | Open |
| Sep 25, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND SOUTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''1'' | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 6th STORY | Open |
| Aug 31, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 6th STORY | Open |
| Aug 31, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AND CEILING IN THE ENTRANCE LOCATED AT APT 612, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:23 AM ET. BBL 3060400001.