Brooklyn · Block 1483 · Lot 1 · 11221

87 Ralph Avenue

4 floors · 12 apartments · 10,684 sq ft · built 1908 · class C7 · owner of record: All Boro Management Co Llc

14open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 13, 2019Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. AT THE TIME OF INSPECTION NYPD HAD CALLED BECAUSE A PIECE OF DECORATIVE STOVE HAS FALLEN FROM ABOCE THE 2 FLOOR WINDOW & CRASHED ONTO THE PUBLIC SIDEWALK.
#35407141X
Nov 18, 2019
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#12295
DOB VIOLATION - ACTIVE
Oct 17, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00747
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#11460
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#24163
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Oct 17, 2019AEUHAZ FTC-AEU-HAZ
Active
Dec 31, 2009Boiler LBLVIO
Active
HPD (6) · C 0 · B 5 · A 1
IssuedClassViolationCorrect by
Jul 7, 2016B§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT)Aug 11, 2016
Mar 2, 2015BApt 2C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 6, 2015
Mar 2, 2015BApt 2C · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 6, 2015
Apr 10, 2013BApt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 15, 2013
Apr 10, 2013BApt 2D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DFFECTIVE LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 15, 2013
Sep 24, 2009AApt 1-C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1-C, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 28, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 7:20 PM ET. BBL 3014830001.

Look up another building