Queens · Block 9302 · Lot 28 · 11418

87-60 113 Street

6 floors · 58 apartments · 53,166 sq ft · built 1933 · class D1 · owner of record: 5501/8760 C.A.S. Llc

27open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-08 (Accepted). Agency page

Dec 31, 2026
in 62 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 53,166 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9302). Agency page

Dec 31, 2032
in 2254 days
Next due 2032

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Mar 16, 2022Elevators CLASS - 1
PRVIDE LIGHTS FOR TOP OF CAR. DLM WAS INSTALLED AS MANDATED BY CODE A17.1 SECTION 3.10.12 APPENDIX K3 OF THE NYCBC 2014 CODE. BUT NOT IN COMPLIANCE WITH THE CODE FIREMAN SERVICE MISSING.
#39058221Z
Jun 7, 2022
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
May 5, 2005ELEVATOR

#9444/126636
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
HPD (23) · C 2 · B 20 · A 1
IssuedClassViolationCorrect by
Sep 16, 2026BApt 5B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST, WEST, AND NORTH WALLS IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 21, 2026
Sep 16, 2026AApt 5B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 20, 2026
Sep 16, 2026BApt 5B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 21, 2026
Sep 16, 2026BApt 5B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK NORTH WALL AT SINK IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 21, 2026
Sep 16, 2026BApt 5B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 21, 2026
Sep 18, 2025BApt 5A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTHOct 23, 2025
Sep 18, 2025BApt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHOct 23, 2025
Sep 18, 2025BApt 6G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 23, 2025
Sep 18, 2025BApt 1G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 23, 2025
Aug 7, 2025BApt 3J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTHSep 25, 2025
Aug 7, 2025BApt 2D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHSep 25, 2025
Aug 7, 2025BApt 5C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHSep 25, 2025
Aug 7, 2025BApt 6H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHSep 25, 2025
Aug 7, 2025BApt 2A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHSep 25, 2025
Aug 7, 2025BApt 2C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHSep 25, 2025
Aug 7, 2025BApt 2G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 25, 2025
Aug 7, 2025BApt 2K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM EAST AT SOUTHSep 25, 2025
Aug 7, 2025BApt 1C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTSep 25, 2025
Aug 7, 2025BApt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTHSep 25, 2025
Aug 7, 2025BApt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTHSep 25, 2025
Jul 30, 2025C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Aug 3, 2025
Jul 30, 2025C§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Aug 3, 2025
Oct 28, 2013BApt 1C · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHDec 2, 2013

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST, WEST, AND NORTH WALLS IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 16, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 16, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 16, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK NORTH WALL AT SINK IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 16, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 6:21 PM ET. BBL 4093020028.