Brooklyn · Block 1265 · Lot 46 · 11213

869 Eastern Parkway

4 floors · 8 apartments · 10,265 sq ft · built 1905 · class C1 · owner of record: Mhany 2015 Housing Development Fund Corp

6open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Sep 17, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT INTERIOR 4TH & BULKHEAD STAIRWELL AND LANDING MISCELLANEOUS HOUSEHOLD ITEMS, EXTERIOR EXPOSURE 3(BACK) 3RD FLOOR FIRE ESC
#39204498Y
Nov 25, 2026
PENDING
$1,250
DOB (5)
IssuedViolationStatus
Sep 17, 2026CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT INCIDENT EXPOSURE #1(FRONT) SCHOOL BUS IMPACTED ENTRANCE WAY. ON THE 2ND FLOOR BALCONY AND PILLARS COLLAPSED UPON REMOVAL OF BUS, FRONT ENTRANCE DOOR DAMAGED UNREPAIRABLE. PARTIAL VACATE ISSUED FOR APARTMENT 1A,2A,2B,3A,3B,4A,4B.
#26-02224
DOB VIOLATION - ACTIVE
Sep 17, 2026CONSTRUCTION
EMERGENCY WORK ORDER-FRONT FACADE/PORTICO WAS DAMAGED BY BUS IMPACTNG THE BLDG ON 9/17/26.STONE PORTICO CLLPSD&DEBRIS NOTED @ FRONT STOOP PRIMARY MEANS OF EGRESS BLOCKED/COMPROMISED.IMMED REMOVE THE DEBRIS & SECURE LOOSE STONE/BRICK,INSTALL FENCE TO SECURE SITE,REINSTATE PRIMARY MEANS OF EGRESS
#FEU30801XC
DOB VIOLATION - ACTIVE
Sep 17, 2026CONSTRUCTION
FAILURE TO MAINTAIN.DUE TO BUS IMPACTNG THE BLDG ON 9/17/26 ARCHITECTURAL STONE PORTICO CLLPSD.FRNT FACDE WALL WAS DMGD.STONE STOOP DISPLACD.DEBRIS WERE BLCKNG THE MAIN ENTRANCE.PRIMARY EGRESS CMP.ENGAGE NYSPE&LIC'D CNTRCTR TO EVAL THE FRNT FACADE&PRIMARY MEANS OF EGRESS&RPAIR THE BLDG UNDR PRMT.OBT
#FEU30802XC
DOB VIOLATION - ACTIVE
Sep 17, 2026IMMEDIATE EMERGENCY
REMEDY- ERECTTIGHT FENCE TOTAL OF APPROX. 100'LINEAR FT AS FOLLOWS EXP#1 ON (EASTERN PKWY) FRONT YARD AT EXP 1& 2 (LEFT) PROJECTING FROM BLDG 30'LINEAR FT AT FRONT YARD ALONG SIDEWALK 40' LINEAR FT AT EXP 1 & 4 (RIGHT)PROJECTING FROM BLDG 30' LINEAR FT ON (ALBANY AV) TO SAFE GUARD THE PUBLIC & PROPE
#20596
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#36180
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 17, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT INCIDENT EXPOSURE #1(FRONT) SCHOOL BUS IMPACTED ENTRANCE WAY. ON THE 2ND FLOOR BALCONY AND PILLARS COLLAPSED UPON REMOVAL OF BUS, FRONT ENTRANCE DOOR DAMAGED UNREPAIRABLE. PARTIAL VACATE ISSUED FOR APARTMENT 1A,2A,2B,3A,3B,4A,4B.Open
Sep 17, 2026DOBCONSTRUCTION: EMERGENCY WORK ORDER-FRONT FACADE/PORTICO WAS DAMAGED BY BUS IMPACTNG THE BLDG ON 9/17/26.STONE PORTICO CLLPSD&DEBRIS NOTED @ FRONT STOOP PRIMARY MEANS OF EGRESS BLOCKED/COMPROMISED.IMMED REMOVE THE DEBRIS & SECURE LOOSE STONE/BRICK,INSTALL FENCE TO SECURE SITE,REINSTATE PRIMARY MEANS OF EGRESSOpen
Sep 17, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN.DUE TO BUS IMPACTNG THE BLDG ON 9/17/26 ARCHITECTURAL STONE PORTICO CLLPSD.FRNT FACDE WALL WAS DMGD.STONE STOOP DISPLACD.DEBRIS WERE BLCKNG THE MAIN ENTRANCE.PRIMARY EGRESS CMP.ENGAGE NYSPE&LIC'D CNTRCTR TO EVAL THE FRNT FACADE&PRIMARY MEANS OF EGRESS&RPAIR THE BLDG UNDR PRMT.OBTOpen
Sep 17, 2026DOBIMMEDIATE EMERGENCY: REMEDY- ERECTTIGHT FENCE TOTAL OF APPROX. 100'LINEAR FT AS FOLLOWS EXP#1 ON (EASTERN PKWY) FRONT YARD AT EXP 1& 2 (LEFT) PROJECTING FROM BLDG 30'LINEAR FT AT FRONT YARD ALONG SIDEWALK 40' LINEAR FT AT EXP 1 & 4 (RIGHT)PROJECTING FROM BLDG 30' LINEAR FT ON (ALBANY AV) TO SAFE GUARD THE PUBLIC & PROPEOpen
Sep 17, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT INTERIOR 4TH & BULKHEAD STAIRWELL AND LANDING MISCELLANEOUS HOUSEHOLD ITEMS, EXTERIOR EXPOSURE 3(BACK) 3RD FLOOR FIRE ESCOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 6:01 AM ET. BBL 3012650046.

Look up another building