5 floors · 8 apartments · 8,016 sq ft · built 1930 · class C7 · owner of record: 862 9th Ave. Associates Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-17 (Accepted). Agency page | Dec 31, 2026 in 68 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 1, 2011 | Boilers CLASS - 2 15,21B,32A,34B 48A,50,50A,50B 50C,50D,50E. 50-WATER LINES NOT SUPPORT ED PROPERLY. 50A-EXPOSED COPPER OIL LINES. 50B-INSUFFICIENT FRESH AIR.50C-FLUE PIPE LEAVING BOILER ROOM NOT INSULATED 50D-MISSING CLEAN OUT #32070058P | Mar 24, 2011 STIPULATION/IN-VIO | $0 |
| Jul 15, 2009 | Boilers CLASS - 2 B254,5B,6A,15,16,21B,24A,25A,32A,40,44A,48A,50,50A,B,C,D,E,F,,G,H,I,J.50-FRONT & REAR FLAME SIGHT GLASSES DEFECTIVE.50A-SOOT & DEBRIS IN BOILER ROOM.50B-GASKETS MISSING IN BOILER FLUE PLATES"CEMENT NOT ACCEPTAB #32066066N | Sep 3, 2009 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #01713 | DOB VIOLATION - ACTIVE |
| Feb 26, 2014 | CONSTRUCTION AS NOTED AT THE TIME OF INSPECTION AT AN ACTIVE CONSTRUCTION SITE, FAILURE TO PROVIDE APPROVED PLANS FOR BOTH TEMPORARY AND PERMANENT SUPPORT OF CELULAR EQUIPMENT PLATFORM WHICH IS LOCATED ON THE BUILDING PARAPET WALLS. THE OWNER TO OBTAIN LICENSED PROF ENGINEER TO SUBMIT SIGNED/SEALED DRAWINGS TO D #FEU10401DA | DOB VIOLATION - ACTIVE |
| Aug 13, 2013 | CONSTRUCTION #FEU10401DA | DOB VIOLATION - ACTIVE |
| Jun 19, 2013 | CONSTRUCTION BORO-COMM HAS ISSUED AN IMMEDIATE STOP WORK PORDER FOR ALL WK UNDER APP/120400912 DUE TO WITHDRAWAL OF PERMIT HOLDER.O%OF WK COMPLETED AT AT TIME OF INSPECTION REMEDY:STOP ALL WORK IMMEDIATELY. MAKE SITE SAFE, PROVIDE ALL REQUIRED DOCUMENTS TO THE BORO-COMM OFFICE FORTHWITH #0403RB | DOB VIOLATION - ACTIVE |
| Jan 26, 2011 | CONSTRUCTION FEU #10401NC | DOB VIOLATION - ACTIVE |
| Mar 26, 2001 | CONSTRUCTION #ZSTF01DP | DOB VIOLATION - ACTIVE |
| Mar 26, 2001 | CONSTRUCTION #ZSTF02DP | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 8, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 13, 2026 |
| Sep 4, 2025 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 9, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 8, 2026 | HPD B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 11:06 AM ET. BBL 1010460061.