Brooklyn · Block 1777 · Lot 61 · 11221

861 Dekalb Avenue

3 floors · 2 apartments · 3,128 sq ft · built 1931 · class S2 · owner of record: Pentecostal Ch Of God

9open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
787dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 300 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 787 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Aug 8, 2015Construction CLASS - 3
FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. NOTED: AT WEST ELEVATION STUCCO IS CRACKED AND BULGED. RMDY: MAKE SAFE REPAIR AND MAINTAIN.
#35137296N
Sep 28, 2015
IN VIOLATION
$0
Aug 5, 2015Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTE @ EXP2 THE BLDGIS LEANING WHICH IS CAUSING STRESS CRACKS ON THE STUCCO & ON THE INTERIOR WALLS ON THE 2ND FL.REM COMPLY W/ THE NOV
#35128927X
Jan 11, 2016
ADMIT/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (7) · C 7 · B 0 · A 0
IssuedClassViolationCorrect by
Dec 27, 2007CApt 4R · SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT ENTRANCE GATE TO THE BUILDING LOCATED AT APT 4RJan 2, 2008
Jul 3, 2006CSECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES KITCHEN 2ND STY APT 2L.Jul 21, 2006
Jul 3, 2006CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES AT KITCHEN AND BATHROOM 2ND STY APT. #2R.Jul 21, 2006
Jul 3, 2006CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM 2ND STY SOUTH APT 2L.Jul 21, 2006
Jul 3, 2006CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES AT KITCHEN AND BATHROOM 2ND STY APT. #2R.Jul 21, 2006
Jul 3, 2006CSECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES SHUT OFF BY B.U.G. KITCHEN 2ND STY EAST APT. #2R ER-1Jul 21, 2006
Jul 3, 2006CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES AT KITCHEN AND BATHROOM 2ND STY APT. #2L.Jul 21, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 2:45 AM ET. BBL 3017770061.

Look up another building