| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 21, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION, AN 8-STORY BUILDING UNDER CONSTRUCTION HAD MULTIPLE DEBRIS PILES ON THE 7TH FLOOR AND MULTIPLE FLOOR OPENINGS ON THE 6TH FLOOR, CREATING TRIP, FALL, FIRE, AND RODENT HAZARDS. STOP ALL #39560885P | Jan 6, 2027 PENDING | $2,500 |
| Oct 16, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION 8-STORY NB AT 6TH FL. FOOTPRINT 7183 SQ. FT. APPROX. SITE CLOSED AND THERE WAS NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE TO ALERT WATCHPERSON AND TO VERIFY #39560695Y | Dec 23, 2026 PENDING | $5,000 |
| Oct 15, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION I OBSERVED 2 WORKERS WORKING ON 2ND FLOOR BALCONY(EXP#1) WEARING HARNESSES BUT NOT SECURED TO ANY POINT OF ANCHORAGE APPROX. 10-12 FEET HIGH WITH NO GUARDRAIL PROVIDED AS REQUIRED-S #39560632R | Dec 23, 2026 PENDING | $5,000 |
| Oct 15, 2026 | Construction CLASS - 2 WORK CONTRARY TO SSP//AT THE TIME OF MY INSPECTION I OBSERVED NEEDLE BEAMS INSTALLED AT EXP#3 AND 7 STORY NEW BUILDING WORK ABOVE 1 STORY ADJ PROPERTY ONGOING -NO ADJ PROPERTY PROTECTION PROVIDED AS PER SSP AN #39560631P | Dec 23, 2026 PENDING | $1,250 |
| Oct 15, 2026 | Construction CLASS - 2 OBSERVED SUPPORTED SCAFFOLD INSTALLED CONTRARY TO PLANS EXP#1/4-USING SCREW JACK EXTENSION BETWEEN FRAMES STARTING FROM GROUND AND SHED LEVEL-NOT ON PLANS,AT EXP#4 USING 3 FEET HIGH FRAMES ON 1ST LEVEL ON SWS G #39560636Y | Dec 23, 2026 PENDING | $1,250 |
| Oct 15, 2026 | Unknown CLASS - 2 BC 3308.6.1.4.1-SUPPORTED SCAFFOD ALTERNATIVE FOR HORIZONTAL NET-OBSERVED ACTIVE 7TH FL CONCRETE POUR-USING SUPPORTED SCAFFOLD AS ALTERNATIVE FOR HORIZONTAL NETTING-LEVELS ABOVE WHERE THE HORIZONTAL NETS SHALL #39560630N | Dec 23, 2026 PENDING | $2,500 |
| Oct 15, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF ACTIVE 8 STORY NEW BUILDING I OBSERVED NEEDLE BEAMS INSTALLED AT EXP#3 4TH FLOOR CONTRARY TO PLANS-NEEDLE BEAM SECUREMENT ( KINDORFF CONNECTION DETAIL) NOT AS PER DETAIL ON PLAN- #39560635M | Dec 23, 2026 PENDING | $1,250 |
| Jan 31, 2026 | Construction CLASS - 2 INACTIVE JOBSITE. I OBSERVED THAT THE CONSTRUCTION FENCE AROUND JOBSITE PERIMETER WAS NOT PROPERLY MAINTAINED ACCORDING TO BC 3307.7. FENCE PANELS COVERED WITH MULTIPLY GRAFFITI AND POSTERS / POSTING (ADVERTIS #39549734K | Dec 7, 2026 | $1,000 |
| Jan 31, 2026 | Unknown CLASS - 2 BC-3303.4.1.1. AT THE TIME OF INSPECTION OBSERVED SIDEWALK AROUND JOBSITE PERIMETER NOT MAINTAINED OR CLEAN COVERED WITH ACCUMULATED SNOW AND ICE CREATING A HAZARDOUS CONDITION THAT MAY CONSTITUTE A SLIPPING, T #39549735M | Dec 7, 2026 | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, AN 8-STORY BUILDING UNDER CONSTRUCTION HAD MULTIPLE DEBRIS PILES ON THE 7TH FLOOR AND MULTIPLE FLOOR OPENINGS ON THE 6TH FLOOR, CREATING TRIP, FALL, FIRE, AND RODENT HAZARDS. STOP ALL | Open |
| Oct 16, 2026 | ECB | Unknown: AT TIME OF INSPECTION 8-STORY NB AT 6TH FL. FOOTPRINT 7183 SQ. FT. APPROX. SITE CLOSED AND THERE WAS NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE TO ALERT WATCHPERSON AND TO VERIFY | Open |
| Oct 15, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION I OBSERVED 2 WORKERS WORKING ON 2ND FLOOR BALCONY(EXP#1) WEARING HARNESSES BUT NOT SECURED TO ANY POINT OF ANCHORAGE APPROX. 10-12 FEET HIGH WITH NO GUARDRAIL PROVIDED AS REQUIRED-S | Open |
| Oct 15, 2026 | ECB | Construction: WORK CONTRARY TO SSP//AT THE TIME OF MY INSPECTION I OBSERVED NEEDLE BEAMS INSTALLED AT EXP#3 AND 7 STORY NEW BUILDING WORK ABOVE 1 STORY ADJ PROPERTY ONGOING -NO ADJ PROPERTY PROTECTION PROVIDED AS PER SSP AN | Open |
| Oct 15, 2026 | ECB | Construction: OBSERVED SUPPORTED SCAFFOLD INSTALLED CONTRARY TO PLANS EXP#1/4-USING SCREW JACK EXTENSION BETWEEN FRAMES STARTING FROM GROUND AND SHED LEVEL-NOT ON PLANS,AT EXP#4 USING 3 FEET HIGH FRAMES ON 1ST LEVEL ON SWS G | Open |
| Oct 15, 2026 | ECB | Unknown: BC 3308.6.1.4.1-SUPPORTED SCAFFOD ALTERNATIVE FOR HORIZONTAL NET-OBSERVED ACTIVE 7TH FL CONCRETE POUR-USING SUPPORTED SCAFFOLD AS ALTERNATIVE FOR HORIZONTAL NETTING-LEVELS ABOVE WHERE THE HORIZONTAL NETS SHALL | Open |
| Oct 15, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION OF ACTIVE 8 STORY NEW BUILDING I OBSERVED NEEDLE BEAMS INSTALLED AT EXP#3 4TH FLOOR CONTRARY TO PLANS-NEEDLE BEAM SECUREMENT ( KINDORFF CONNECTION DETAIL) NOT AS PER DETAIL ON PLAN- | Open |