5 floors · 105,600 sq ft · built 1925 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 60 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 105,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9204). Agency page | Dec 31, 2034 in 2982 days | Next due 2034 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 3, 2026 | Construction CLASS - 2 REISSUE#35691852N DATE OF ISSUE:03.21.2025 EXIT DOOR NOT SELF CLOSING PROPERLY AT 4TH FL STAIRWAY D 2ND FL STAIRWAY C 1ST FLOOR.STAIRWAY C &STAIRWAY B EACH AREA ONE EXIT DOOR.1ST FL STAIR A STAIR C & D EXIT 2,6 #35728707N | Mar 23, 2026 POP/IN-VIO | $0 |
| Mar 3, 2026 | Construction CLASS - 2 REISSUE#35691851L DATE OF ISSUE:03.21.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERV #35728708P | Mar 23, 2026 POP/IN-VIO | $0 |
| Mar 3, 2026 | Construction CLASS - 2 REISSUE#35691854R DATE OF ISSUE:03.21.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED WATER LEAKING THROUGH LOWER ROOF IN AUDITORIUM ABOVE STAGE LARGE PUD #35728706L | Mar 23, 2026 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED INTERIOR FPSC DOORS ARE RACKED/RUBBING ON FRAME 5 FL STAIR C, 1ST FL STAIR A BASEMENT STAIR C & D.EXIT 2,6 & 11 INTERIOR SMOKE DOORS.REM:REPAIR AND/OR #35691853P | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 REISSUE#35678939J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS.NOTED 50% OF EMERGENCY LIGHTS NOT WORKING IN AUDITORIUM & CAFETERIA,4 IN CELLA #35691851L | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED WATER LEAKING THROUGH LOWER RENT IN AUDITORIUM ABOVE STAGE.LARGE PUDDLE ON STAGE& FLOOR.REM:REPAIR AND/OR REPLACE. #35691854R | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.EXIT#12 EXTERIOR DOOR HAS DEFECTIVE CLOSER DEVICE.NOT SELF-CLOSING STAYS OPEN.REM:REPAIR/REPLACE DOOR. #35691852N | Jul 8, 2025 POP/IN-VIO | $0 |
| Apr 9, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED APPROX.50% OF EMERGENCY LIGHTS NOT OPERATIVE WHEN TESTED AT AUDITORIUM #35678939J | Jul 3, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03989 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 6:33 AM ET. BBL 4092040028.