3 floors · 32,187 sq ft · built 1953 · class W2 · owner of record: R C Church Ascension
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 32,187 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 13, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720093L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ROOFING PAPER IS DETERIORATING, BUBBLING, BLISTERING IN A LARGE AREA DUE TO EXCESSIVE PONDING AND IN DISREPAIR OBSERVED U #35732299P | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720098K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: GLASS BROKEN ON EXTERIOR WINDOWS AT EXPOSURE #1 GLASS BLOCK WHICH IS INSIDE STAIR D BETWEEN 3RD TO 2ND FLOOR, STAIR D BET #35732295H | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720095P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED SMOKE DOORS AND CLASSROOMS NOT SELF-CLOSING DUE TO BINDING, MISSING OR FAULTY HARDWARE ON SMOKE DOOR STAIR D(2 #35732298N | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720097Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: WATER DAMAGE DUE TO LEAK AT BULKHEADS B, C, AND D WITH SPALLING PAINT AND PLASTER AT ALL LOCATIONS AND HAS NOT BEEN FIXED #35732296J | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ILLEGAL HARDWARE KICK STOPS INSTALLED ON FIRE RATED CLASSROOM, SMOKE AND EMERGENCY EXTERIOR EXIT DOORS ON CLASSROOM, 305, 205, 202, AND 201, INCLUDI #35732575M | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ELECTRICAL CONDUIT ON EXTERIOR EXP #2 SUPPLYING ELECTRIC TO LIGHT FIXTURE, DETACHED/BROKEN AT COUPLING JOINT EXPOSING LIVE ELECTRICAL WIRING AGAINST #35732576Y | May 8, 2026 POP/IN-VIO | $0 |
| Apr 13, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720095R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381.1. NOTED: EMERGENCY ILLUMINATION AND EXIT SIG #35732297L | May 8, 2026 POP/IN-VIO | $0 |
| May 27, 2025 | Construction CLASS - 2 REISSUE #35677449M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NOTED AT ROOF IS DETERIORATING, PUDDLING, BUBBLING, BLISTERING AND DISREPAIR WITH MATERIAL LIFTING UP. REMEDY: REPAIR AND/OR REPLACE RO #35720093L | Jul 9, 2025 POP/IN-VIO | $0 |
| May 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT STAIR D BASE, (2) BETWEEN 1ST AND 2ND FLOOR STAIR WELL D(1), AUDITORIUM(3), BOILER ROOM(1), MAIN ENTRANCE(1), 8 WINDOWS BROKEN. REMEDY: REPAIR AND #35720098K | Jul 9, 2025 POP/IN-VIO | $0 |
| May 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT BULKHEAD STAIR B, C, D WATER PENETRATION AT CEILING AND D STAIRWAY. REMEDY: REPAIR AND/OR REPLACE. #35720097Z | Jul 9, 2025 POP/IN-VIO | $0 |
| May 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1, 27-381. NOTED AT 3RD FLOOR STAIR D(ES), BASEMENT BOX 1B, AUDITORIUM, 261 EXIT 3 #35720096R | Jul 9, 2025 POP/IN-VIO | $0 |
| May 27, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED AT 2ND FLR SMOKE STAIR B AND D, 1ST FLOOR STAIR D(110), (S)STAIR C, BASEMENT STAIR D(S), (S) BY EXIT 6, (S)2B EXIT, CORRIDOR BY 19. REMEDY: REPAIR AND/OR REPLACE. #35720095P | Jul 9, 2025 POP/IN-VIO | $0 |
| Jun 6, 2024 | Construction CLASS - 2 FAILURE TO MAINATIN BUILDING IN CODE-COMPLIANT MANNER. ROOFING MATERIAL LARGE POOL IN MIDDLE OF ROOF, LARGE AREA LIFTING UP ROOFING BUBBLINGUP AND ROOFING MATERIAL DETERIORATING. REMEDY: REPAIR AND/OR REPLACE. #35677449M | Aug 20, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 23, 2009 | CONSTRUCTION #0501DL | DOB VIOLATION - ACTIVE |
| Oct 22, 2008 | CONSTRUCTION #0408MA | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 3:51 AM ET. BBL 4028640036.