3 floors · 46,307 sq ft · built 1922 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 57 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,307 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 27, 2026 | Construction CLASS - 2 RE-ISSUE #35691868H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT NEW ONE STORY WING, WATER COMING IN FROM ROOF. SIGNS OF WATER LEAKS ON FLOOR TILES AND CEILING. REMEDY: REPAIR AND/OR REPLAC #35728885X | Mar 17, 2026 POP/IN-VIO | $0 |
| Feb 27, 2026 | Construction CLASS - 2 RE-ISSUE #35691867X. ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALIDCERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2. NOTED: BUILDINGALTERED UNDER JOB #40191396 NO NEW C OF O ISSUED. BUILDING WAS OCCUPIE #35728886H | Mar 17, 2026 POP/IN-VIO | $0 |
| Feb 27, 2026 | Construction CLASS - 2 MISCELLANEOUS. RE-ISSUE #35691866Y. FAILURE TO OBTAIN A SIGN-OFF FOR COMPLETED WORK. NOTED: JOB #402326684 TO DO TEMPORARY TRANSPORTABLE BUILDING HAS BEEN COMPLETED. HOWEVER NOT SIGNED OFF AND NO LETTER OF COMP #35728887J | Mar 17, 2026 POP/IN-VIO | $0 |
| Feb 27, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT, 3RD FLR-307, 304. 2ND FLR-203. REMEDY: REPAIR AND/OR REPLACE. #35728888L | Mar 17, 2026 POP/IN-VIO | $0 |
| Aug 15, 2025 | Boilers CLASS - 2 FOUND HB SMITH STEAM BOILER MODEL-28A-4OPERATING WITH DEFECTS. PRESSURE CONTROLS MANIFOLD UNDERSIZED. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #39157263K | Aug 25, 2025 POP/IN-VIO | $0 |
| Mar 24, 2025 | Construction CLASS - 2 REISSUE#35679024X ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.NOTED BUILDING ALTERED UNDER JOB#40191396 NO NEW COFO ISSUEED.BUILDING WAS OCCUPIED AS S #35691867X | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 24, 2025 | Construction CLASS - 2 REISSUE#35678851P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT NEW ONE STORY WING.WATER COMING IN FROM ROOF SIGNS OF WATERLEAK ON FLOOR TILES & CEILING.REM:REPAIR AND/OR REPLACE. #35691868H | Jun 3, 2025 POP/IN-VIO | $0 |
| Mar 24, 2025 | Construction CLASS - 2 REISSUE#35679022M FAILURE TO OBTAIN A SIGN-OFF FOR COMPLETED WORK.NOTED JOB#402326684 TO DONE TEMPERARY TRANSPORTABLE BUILDING HAS BEEN COMPLETE.HOWEVER NOT SIGNED OFF & NO LETTER OF COMPLETION ISSUED AS OF YET #35691866Y | Jul 8, 2025 POP/IN-VIO | $0 |
| Apr 12, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NEW WING SIDE ALL ROOM WATER COMING IN FROM ROOF. SIGNS OF WATER LEAK ON FILES. REMEDY: REPAIR AND/OR REPLACE. #35678851P | Jun 18, 2024 POP/IN-VIO | $0 |
| Apr 12, 2024 | Construction CLASS - 2 REISSUE#35665297Y ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2 RECORDS SHOW 40191396 FOR DEMO OF ERECTED 1 STORY FOR CLASSROOMS NO SIGN AN NO NEW COFO #35679024X | Jul 3, 2024 POP/IN-VIO | $0 |
| Apr 12, 2024 | Construction CLASS - 2 MISCELLANEOUS REISSUE 35665296M FAILURE TO OBTAIN A SIGN OFF A COMPLETED WORK DEMO JOB 402326684 FOR DEMO AND PER FORMED TEMP TRANSPORTED BUILDING CONSTRUCTION FOR NEW BUILDING/CLASSROOM.REM:COMPLY WITH CODE. #35679022M | Jul 3, 2024 POP/IN-VIO | $0 |
| Mar 6, 2023 | Construction CLASS - 2 28-116.4,28-301.1 REISSUE#35546312L 2/8/2021.FAILURE TO OBTAIN A SIGN OFF OF A COMPLETED WORK DEMO JOB#402326684 FOR DEMO AND PERFORMED TEMPORARY TRANSPORTED BUILDING CONSTRUCTION FOR NEW BUILDING/CLASSROOM AS #35665296M | Jun 6, 2023 POP/IN-VIO | $0 |
| Mar 6, 2023 | Construction CLASS - 2 REISSUED#35546311J 2/8/2021.ALTERED CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1,28-118.3.2.RECORDS STATE#40191396 FOR DEMO OF ERECTED 1 STORY FOR CLASSROOMS.NO SIGNED OF #35665297Y | Jun 6, 2023 POP/IN-VIO | $0 |
| Jun 1, 2022 | Construction CLASS - 2 REISSUED#35546311J ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1;28-118.3.2. NOTED:JOB#400191396-01-AL FILED FOR STRUCTURAL PLANS FOR 1-STORY ADDITION TO EXISTING PUBLIC SCHOOL. NO ISSU #35643463N | Oct 11, 2022 POP/IN-VIO | $0 |
| Jun 1, 2022 | Construction CLASS - 2 28-301.1;28-116.4 REISSUED#35546312L FAILURE TO OBTAIN A SIGN OFF OF COMPLETED WORK. NOTED:JOB#402326684 FILED FOR REMOVAL/DEMOLISHING OF TEMPORARY TRANSPORTED CLASSROOMS HAS BEEN COMPLETED. HOWEVER THE JOB HAS #35643462L | Oct 11, 2022 POP/IN-VIO | $0 |
| Feb 8, 2021 | Construction CLASS - 2 REISSUE 35486737P ALTERED .CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2-NOTED UNDER LAT JOB #40191396 TO BUILD 1 STORY ADDITION NO AMENDED OR UPDATED C OF O I #35546311J | Jun 1, 2021 POP/IN-VIO | $0 |
| Feb 8, 2021 | Construction CLASS - 2 28-301.1,28-116.4=REISSUE -35486736N FAILURE TO OBTAIN A SIGN OFF OF COMPLETED WORK NOTE DEMO JOB #402326684 TO DEMO AND REMOVE TEMPORARY TRANSPORTTED CLASSROOM HAS BEEN COMPLETED EXCEPT FOR OBTAINING THE FINAL #35546312L | Jun 1, 2021 POP/IN-VIO | $0 |
| Mar 24, 2020 | Construction CLASS - 2 REISSUE: #35148144H- ALTERD CHANGE BUILDING OCCUPIED W/OUT A VALID CERTIFICATE OF OCCUPANCY. NOTED: BLDG. ALTERD UNDER JOB #40191396 ALT 1. NO CERT OF OCCUPANCY ISSUED.REM: OBTAIB VALID C OF C #35486737P | Aug 18, 2020 POP/IN-VIO | $0 |
| Mar 24, 2020 | Construction CLASS - 2 28.301.1 28-116.4 REISSUE #35148147N- FAILURE TO OBTAIN A SISN OFF OF COMPLETED WORK. TEMPORARY TRANSPORTABLE UNIT DEMOED UNDER JOB #402326684 COMPLETION HAS BEEN ISSUED. REM: COMPLY WITH CODE. #35486736N | Aug 18, 2020 POP/IN-VIO | $0 |
| Mar 22, 2019 | Construction CLASS - 2 REISSUE # 35311338N. ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O.NOTED: TEMPORARY TRANSPORTABLE UNIT DEMOLISHED UNDER JOB # 402326684 HASN'T BEEN SIGNED OFF. REMEDY: OBTAINT VALID C OF O OR DISCONTINUE ILL #35402496M | Jul 2, 2019 POP/IN-VIO | $0 |
| Feb 1, 2018 | Construction CLASS - 2 REISSUE#35225814Y ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3;28-118.3.2. NOTED: BLDG ALTERED UNDER JOB#40191396 W/O OBTANING A NEW OR VALID C OF O. REMEDY: OBTAIN VALID C OF O OR DISCONTIN #35311337L | May 8, 2018 POP/IN-VIO | $0 |
| Feb 1, 2018 | Construction CLASS - 2 SEC. 28-116.1 REISSUE#35225813M FAILED TO OBTAIN A SIGN OF COMPLETED WORK PER 28-116.4. NOTED: TEMPORARY TRANSPORTABLE UNIT DEMOED UNDER JOB#402326684 HAS NOT BEEN SIGNED OFF. NO LETTER OF COMPLETION HAS BEEN #35311338N | May 8, 2018 POP/IN-VIO | $0 |
| Feb 27, 2017 | Construction CLASS - 2 SEC: 28-116.4. REISSUE# 35148147N. FAILURE TO OBTAIN A SIGN OFF OF COMPLETED WORK, PER 28-116.4. NOTED: JOB# 402326684 HAS BEEN COMPLETED, DEMO OF TEMPORARY TRANSPORTABLE UNIT & HAS NOT BEEN SIGNED OFF. REM: CO #35225813M | Apr 11, 2017 POP/IN-VIO | $0 |
| Feb 27, 2017 | Construction CLASS - 2 REISSUE# 35177677N. ALTERED/CHANGED BLDG OCCUPIED W/OUT A VALID C OF O AS PER 28-118.3.1- 28-118.3.2. NOTE: BLDG ALTERED UNDER JOB# 40191396W/OUT OBTAINING A NEW OR VALID C OF O. REM: OBTAIN VALID C OF O OR DIS #35225814Y | Apr 11, 2017 POP/IN-VIO | $0 |
| Apr 7, 2016 | Construction CLASS - 2 REISSUE #35148144H.ALTERED CHANGED BLDG OCCUPIED W/O A VALID CERTIFICATE OF OCCUPANCY.NOTE:THE BLDG ALTERED UNDER JOB#40191396AH W/O COFO ISSUED AS PER 28-118.3.1&28-118.3.2. REM:COMPLY W. CODE/OBTAIN VALID C.O #35177677N | Jul 19, 2016 POP/IN-VIO | $0 |
| Oct 9, 2015 | Construction CLASS - 2 OPERATION OF PLACE OF ASSEMBLY W/O A CURRENT CERTIFICATE OF OPERATION.NOTE:@ 1ST FL CAFETERIA,OBS 120 STUDENTS W/OCCUPANCY SIGN FOR 259 PERSONS UNDER JOB #401352004 APPROVED 11/15/2000,WITHDRAWN ON 9/5/ 2002. #35148146L | Jan 5, 2016 POP/IN-VIO | $0 |
| Oct 9, 2015 | Construction CLASS - 2 ALTERED BUILDING OCCUPIED WITHOUT A VALID CERT OF OCCUPANCY.NOTE: BLDG ALTERED UNDER JOB #40191396 ALT I. NO CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED W/ 10 OUTSTANDING REQUIREMENTS. REM:COMPLY W/CODE. #35148144H | Jan 5, 2016 POP/IN-VIO | $0 |
| Oct 9, 2015 | Construction CLASS - 2 28-116.4 FAIL TO OBTAIN A SIGN-OFF OF COMPLETED WORK.NOTE:TEMPORARY TRANSPORTABLE UNIT DEMO-ED UNDER JOB#402326684 HAS NOT BEEN SIGNED OFF; NO LETTER OF COMPLETION HAS BEEN ISSUED.PERMIT EXPIRED (PL) 02/02/2011 #35148147N | Jan 5, 2016 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #29307 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09064 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09065 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #29306 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #29892 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #29893 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19809 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19810 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 1:42 AM ET. BBL 4092800001.