12 floors · 34,098 sq ft · built 2018 · class H3 · owner of record: 857-859 Hotel, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 102 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,098 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2021 | Construction CLASS - 1 3314.3.4 NO LOAD IMPOSED LETTER FOR PIPE SCAFFOLD ON TOP OF SIDEWALK SHED AT EXP2.NOTED AT TIME OF INSPECTION OF A 12 STORY NEW BUILDING ACTIVE JOBSITE,I OBSERVED SUPPORTED SCAFFOLD ON TOP OF SIDEWALK SHED AT E #35591459Z | Dec 17, 2021 IN VIOLATION | $2,500 |
| Sep 22, 2021 | Site Safety CLASS - 1 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33NO LOADS IMPOSED LETTER ON NEEDLE BEAMS EXP4.AT TIME OF INSPECTION OF A 12 STORY NEW BUILDING ACTIVE JOBSITE,I OBSERVED SUPPORTED SCAFFOLD A #35591457P | Dec 17, 2021 IN VIOLATION | $2,500 |
| Sep 22, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY CHAPTER 33-NO6 MONTH INSPECTION LETTER FOR SIDEWALK SHED EXP1,2.NO LETTER FOR SUPPORTED SCAFFOLD EXP1,2,3,4.NOTED AT TIME OF INSPECTION OF A 12 STORY NB #35591458R | Dec 17, 2021 IN VIOLATION | $1,250 |
| Sep 22, 2021 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS-FAILURE TO MAINTAIN SIDEWALK SHED AT EXP2.NOTED AT TIME OF INSPECTION OF A 12 STORY NEW BUILDING ACTIVE JOBSITE,I OBSERVED SIDEWALK SHED IN PLACE AT EXP2 #35591460X | Dec 17, 2021 IN VIOLATION | $2,400 |
| Sep 16, 2021 | Construction CLASS - 1 FAILURE TO PROVIDE SWS WHERE REQUIRED ATOI OF THIS 12STYNB IOBSERVED ACTIVE WORKSITE&PEDESTRIAN WALKWAY ON ST@EXP1 W/NO OVERHEAD PROTECTION TO PROTECT PUBLIC FROM POTENTIAL FALLING CONST OBJECTS.BLDG 125H&WALKW #35583537P | Dec 3, 2021 IN VIOLATION | $10,000 |
| Sep 16, 2021 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT TIME OF INSPECTION AT A 12 STORY BUILDING,I OBSERVED PEDESTRIAN WALKWAY NOT PROPOSED ON SITE SAFETY PLANS.NOT FOLLOWING PLA #35583098M | Dec 3, 2021 IN VIOLATION | $1,250 |
| Aug 2, 2021 | Construction CLASS - 1 BC1704.1.3 UPON CONCRETE & ENFORCEMENT UNIT (CEU) REVIEW AND AUDIT STRUCTURAL DRAWINGS SPECIAL INSPECTION REPORT AND SITE VISIT ON 04/01/21 FOR THIS JOB THE CONCRETE BUILDING HAS CONSTRUCTED UP TO BULKHEAD BUT #35559661M | Apr 15, 2022 IN VIOLATION | $2,500 |
| May 4, 2021 | Construction CLASS - 1 3314.4.8 FAILURE TO MAINTAIN PIPE SCAFFOLD AS PER CODE.AT TIME OF INSPECTION ON AN ACTIVE 12 STORY NB CONSTRUCTION SITE NOTICE ONGOING WORK ON PIPE SCAFFOLD AT EXPO.#4 AT THE BLDG NOTICE WORKERS WORKING ON THE #35552873M | Jul 16, 2021 IN VIOLATION | $2,500 |
| Jul 1, 2020 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS(NEEDLE DEAM INSTALLATION).AT THE TIME OF INSPECTION I OBSERVE ACTIVE CONSTRUCTION JOBSITE.AT UPON REVIEW OF APPROVE NEEDLE DD FOR SUPPORTED PI #35469579Y | May 14, 2021 IN VIOLATION | $2,500 |
| Jul 1, 2020 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVE CONSTRUCTION DOCUMENTS/AMENDMENTS.(SWS)AT TIME OF INSPECTION I OBSERVE ACTIVE CONSTRUCTION JOBSITE.UPON REVIEW APPROVE SWS DESIGN DRAWINGS.NOTE:MISSING SWS IN PLACE IN PLACE AT #35469583R | May 14, 2021 IN VIOLATION | $2,500 |
| Jun 9, 2020 | Construction CLASS - 1 WORK DOES NOT CONFORM TO SITE SAFETY PLAN(SSP).UPON INSPECTION OF A 12STORY NEW BLDG IN 12 FL PHASE I OBSERVED PEDESTRIAN WALKWAY W/SIGNAGE TO USE SAID WALKWAY AT EXPO #1 OF SITE & UPON REVIEW OF SSP I OBSERVED #35487744H | Feb 5, 2021 DEFAULT | $6,250 |
| Jun 9, 2020 | Construction CLASS - 1 SIDEWALK SHED WHERE REQUIRED.UPON INSPECTION OF A 12 STORY NEW BLDG IN12 FL PHASE I OBSERVED PEDESTRIAN WALKWAY AT EXPO #1 OF SITE W/OUT ANYTYPE OF PROTECTION FOR PEDESTRIANS WALKING THROUGH WALKWAY.NOT PROTECT #35487749R | Jan 29, 2021 DEFAULT | $12,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)