14 floors · 775,241 sq ft · built 1930 · class I1 · owner of record: Lenox Hill Hospital
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 775,241 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $122,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 845 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1411). Agency page | Dec 31, 2031 in 1888 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 25, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXP #3(SOUTH ELEV.) BROKEN WINDOW GLASS BETWEEN 10TH AND ROOF. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROV #35681874P | Oct 3, 2024 IN VIOLATION | $0 |
| Jun 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES: AT TIME OF INSPECTION IT WAS OBSERVED: AT EXPOSURE 4(WEST ELEVATION) BUILDING WALL AT MULTIPLE LOCATIONS. MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEAS #35683700Y | Mar 7, 2025 IN VIOLATION | $0 |
| Mar 28, 2018 | Construction CLASS - 1 97R05. 97R UNREGISTERED DEVICE WAS INSTALLED WITHOUT PERMIT BEING OBTAINED AND APPLICATION BEING FILED.REMEDY:FILE APPLICATION AND OBTAIN PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH DOB(CEASE USE). #38262384P | May 17, 2018 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012335Y | Nov 4, 2010 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012332Z | Nov 4, 2010 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012337H | Nov 4, 2010 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012336X | Nov 4, 2010 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012333K | Nov 4, 2010 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012334M | Nov 4, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 23, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV AND EXP2 SOUTH ELEV, SEVERE ERODED STONE WORK AROUND WINDOWS ON SEVERAL FLOORS.SPALLING STO NES AT SPANDRELS AT MULTIPLE FLOORS.ROTTED CORNICE AT PARAPET.STEP CRA CKS IN MORTAR JO #SR0802RF | DOB VIOLATION - ACTIVE |
| Sep 18, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00021 | DOB VIOLATION - ACTIVE |
| Jul 18, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO BULDGING WALL AT MULTIPLE LOCATIONS AT EXP 4 WEST ELEVATION.REMEDY:IMMEDIATELY PROVIDE AND TAKE SAFETY MEASURES T O SECURE AND PROTECT THE PUBLIC AND INSTALL PUBLIC PROTECTION AT ALL E XPOSURES.IMMEDIATELY REPAIR/REPLACE CRACKED WINDOWS #FA10801MA | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01495 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01494 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01496 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01386 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00293 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01493 | DOB VIOLATION - ACTIVE |
| Oct 22, 2019 | FACADE SAFETY PROGRAM #HAZ88409 | DOB VIOLATION - ACTIVE |
| Jun 14, 2012 | CONSTRUCTION #0801 | DOB VIOLATION - ACTIVE |
| Sep 22, 2010 | ELEVATOR #9027/356107 | DOB VIOLATION - ACTIVE |
| Apr 19, 2001 | ELEVATOR #9013/1 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #05970 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #10899 | DOB VIOLATION - ACTIVE |
| Mar 18, 1994 | LOCAL LAW 62/91 - BOILERS #14694 | DOB VIOLATION - ACTIVE |
| Mar 18, 1993 | LOCAL LAW 62/91 - BOILERS #14694 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Sep 18, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Oct 22, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Mar 18, 1994 | Boiler LL6291 | Active |
| Mar 18, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 19, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED NORTH WALL REAR SECTION PUBLIC HALL TO ADJOINING BUILDING THROUGHOUT 6 STY. | Sep 22, 2008 |
| Jun 19, 2008 | B | SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD SOUTH ROOF. | Jul 24, 2008 |
| Jun 19, 2008 | B | SECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TABLES 6 STY PUBLIC HALL. | Jul 24, 2008 |