Manhattan · Block 1411 · Lot 1 · 10021

855 Park Avenue

14 floors · 775,241 sq ft · built 1930 · class I1 · owner of record: Lenox Hill Hospital

48open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 775,241 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $122,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 845 days
Filing window not open yet
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1411). Agency page

Dec 31, 2031
in 1888 days
Next due 2031

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
Jul 25, 2024Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXP #3(SOUTH ELEV.) BROKEN WINDOW GLASS BETWEEN 10TH AND ROOF. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROV
#35681874P
Oct 3, 2024
IN VIOLATION
$0
Jun 27, 2024Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES: AT TIME OF INSPECTION IT WAS OBSERVED: AT EXPOSURE 4(WEST ELEVATION) BUILDING WALL AT MULTIPLE LOCATIONS. MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEAS
#35683700Y
Mar 7, 2025
IN VIOLATION
$0
Mar 28, 2018Construction CLASS - 1
97R05. 97R UNREGISTERED DEVICE WAS INSTALLED WITHOUT PERMIT BEING OBTAINED AND APPLICATION BEING FILED.REMEDY:FILE APPLICATION AND OBTAIN PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH DOB(CEASE USE).
#38262384P
May 17, 2018
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012335Y
Nov 4, 2010
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012332Z
Nov 4, 2010
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012337H
Nov 4, 2010
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012336X
Nov 4, 2010
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012333K
Nov 4, 2010
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012334M
Nov 4, 2010
IN VIOLATION
$0
DOB (17)
IssuedViolationStatus
Apr 23, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV AND EXP2 SOUTH ELEV, SEVERE ERODED STONE WORK AROUND WINDOWS ON SEVERAL FLOORS.SPALLING STO NES AT SPANDRELS AT MULTIPLE FLOORS.ROTTED CORNICE AT PARAPET.STEP CRA CKS IN MORTAR JO
#SR0802RF
DOB VIOLATION - ACTIVE
Sep 18, 2024FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00021
DOB VIOLATION - ACTIVE
Jul 18, 2024CONSTRUCTION
EMERGENCY WORK ORDER DUE TO BULDGING WALL AT MULTIPLE LOCATIONS AT EXP 4 WEST ELEVATION.REMEDY:IMMEDIATELY PROVIDE AND TAKE SAFETY MEASURES T O SECURE AND PROTECT THE PUBLIC AND INSTALL PUBLIC PROTECTION AT ALL E XPOSURES.IMMEDIATELY REPAIR/REPLACE CRACKED WINDOWS
#FA10801MA
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01495
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01494
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01496
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01386
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00293
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01493
DOB VIOLATION - ACTIVE
Oct 22, 2019FACADE SAFETY PROGRAM

#HAZ88409
DOB VIOLATION - ACTIVE
Jun 14, 2012CONSTRUCTION

#0801
DOB VIOLATION - ACTIVE
Sep 22, 2010ELEVATOR

#9027/356107
DOB VIOLATION - ACTIVE
Apr 19, 2001ELEVATOR

#9013/1
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#05970
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#10899
DOB VIOLATION - ACTIVE
Mar 18, 1994LOCAL LAW 62/91 - BOILERS

#14694
DOB VIOLATION - ACTIVE
Mar 18, 1993LOCAL LAW 62/91 - BOILERS

#14694
DOB VIOLATION - ACTIVE
DOB NOW Safety (19)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Sep 18, 2024AEUHAZ FTC-AEU-HAZ
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Oct 22, 2019Facades FISP
CYCLE 8B UNSAFE REPORT FILED
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Mar 18, 1994Boiler LL6291
Active
Mar 18, 1993Boiler LL6291
Active
HPD (3) · C 0 · B 2 · A 1
IssuedClassViolationCorrect by
Jun 19, 2008ASECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED NORTH WALL REAR SECTION PUBLIC HALL TO ADJOINING BUILDING THROUGHOUT 6 STY.Sep 22, 2008
Jun 19, 2008BSECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD SOUTH ROOF.Jul 24, 2008
Jun 19, 2008BSECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TABLES 6 STY PUBLIC HALL.Jul 24, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 6:29 PM ET. BBL 1014110001.

Look up another building