3 floors · 63,500 sq ft · built 1956 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 63,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2688). Agency page | Dec 31, 2028 in 797 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2026 | Construction CLASS - 2 REISSUE#35672040Y NOTED:OBSERVED ON 1ST FLOOR INSIDE GYMNASIUM ON THE FACE OF TWO WALLS THERE ARE STEP CRACKS APPROX.8' LONG FROM CEILING DOWN TO BASKETBALL RIM.FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MA #35734187J | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 20, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:OBSERVED ON 1ST FLOOR EXTERIOR EXITS 1 AND EXIT 3 DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT TIME OF INSPECTION.REM:REPAIR/REPLACE DOOR. #35734189N | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 20, 2026 | Construction CLASS - 2 REISSUE#35672039R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER NOTED:FPSC DOORS DO NOT SELF-CLOSE PROPERLY AT 1ST FLR-STAIRCASE A,CAFETERIA DOORS.CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED #35734188L | Aug 21, 2026 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 REISSUE #35663564K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED IN GYM VERTICAL CRACKS ON MULTIPLE WALLS THAT SPAN OVER LOFT STARTING FROM I-BEAMS GOING DOWNWARD. REMEDY: REPAIR AND/O #35672040Y | Oct 31, 2025 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDAT TIME OF INSPECTION SMOKE DOORS AT FIRST FLOOR STAIRCASE B(BY SECURITY DESK) AND DOOR AT ROOM 313-ARE NOT SELF CLOSING INTO DOOR JAM. REME #35672039R | Oct 31, 2025 POP/IN-VIO | $0 |
| Jul 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT GYM, NEAR MAIN ENTRANCE, APPROX. 10' VERTICAL CRACK IN THE CYNDER BLOCK WALL OBSERVED. REMEDY: MAKE NECESSARY REPAIRS #35663564K | Sep 22, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05962 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05963 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08124 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08125 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 20, 2026 | ECB | Construction: REISSUE#35672040Y NOTED:OBSERVED ON 1ST FLOOR INSIDE GYMNASIUM ON THE FACE OF TWO WALLS THERE ARE STEP CRACKS APPROX.8' LONG FROM CEILING DOWN TO BASKETBALL RIM.FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MA | Open |
| Jul 20, 2026 | ECB | Construction: EXIT DOOR NOT SELF-CLOSING.NOTED:OBSERVED ON 1ST FLOOR EXTERIOR EXITS 1 AND EXIT 3 DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT TIME OF INSPECTION.REM:REPAIR/REPLACE DOOR. | Open |
| Jul 20, 2026 | ECB | Construction: REISSUE#35672039R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER NOTED:FPSC DOORS DO NOT SELF-CLOSE PROPERLY AT 1ST FLR-STAIRCASE A,CAFETERIA DOORS.CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 10:46 PM ET. BBL 2026880001.