4 floors · 56 apartments · 41,792 sq ft · built 1927 · class C7 · owner of record: Tom Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-21 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,792 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 27, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; AT TIME OF INSPECTION FOUND FIRE ESCAPES AT EXP 1 AND COURTYARD WITH MULTIPLE AC UNITS, AND HOUSE HOLD ITEMS OBSTRUCTING EGRESS. ALSO FOUND CARD BOARD PILE #35656342J | Mar 5, 2024 IN VIOLATION | $575 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 23, 2026 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Aug 18, 2026 |
| Jun 4, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE NORTH YARD | Jul 9, 2026 |
| Jun 4, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Jul 9, 2026 |
| Jun 4, 2026 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Jun 30, 2026 |
| Jun 4, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT YARD | Jul 9, 2026 |
| Jun 4, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CENTER COURT | Jul 9, 2026 |
| Feb 24, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, EAST AND WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 4th STORY | Mar 31, 2025 |
| Feb 24, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING , EAST AND WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 4th STORY | May 30, 2025 |
| Jan 21, 2025 | B | Apt 2G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET, AT THE CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' ORIGINAL VIOLATION 17261127 ISSUED 11-SEP-24 HAS BEEN UPGRADED TO CLASS B PE | Feb 25, 2025 |
| Sep 23, 2024 | B | Apt 2G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30 SQUARE FEET ,AT THE CEILING AND SOUTH WALL, IN THE 1ST CLOSET FROM SOUTH AT WEST, IN THE PRIVATE HALLWAY LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Oct 28, 2024 |
| Sep 23, 2024 | A | Apt 2G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Dec 27, 2024 |
| Sep 23, 2024 | B | Apt 2G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30 SQUARE FEET AT THE CEILING, EAST AND WEST WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Oct 28, 2024 |
| Jan 20, 2022 | B | Apt 1A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 10 SQ FT) NORTH WALL (APPROX 2 SQ FT) EAST WALL (APPROX 2 SQ FT) WEST WALL ( APPROX 4 SQ FT ) & SOUTH WALL ( APPROX 2 SQ FT) IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH | Feb 24, 2022 |
| Oct 18, 2017 | C | Apt 4H · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Nov 15, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 23, 2026 | HPD C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 7:32 AM ET. BBL 3060370001.