4 floors · 76 apartments · 31,387 sq ft · built 1995 · class H4 · owner of record: Hks Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-05-17 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,387 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 1, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE KITCHEN 40 AMP ELECTRIC OVEN INSTALLED WITH NEW BREAKER, EMT PIPES, ALSO IN THE BOILER RM NEW HUNG BOILERS INSTALLED WITH NEW ELECTRIC EMT, TOGGLE SW ONE NEW HO #39202584L | Nov 18, 2026 PENDING | $2,500 |
| Sep 1, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED LACK OF SPRINKLER COVERAGE IN HALLWAYS ON 2ND & 3RD FLOORS SOFFITS WERE ADDED WHERE SPRINKLER HEADS USED TO BE CAUSING 15-20FT OF LACK OF COVERAGE CONTRARY TO BC 903.3.3, REPA #39202607P | Nov 18, 2026 PENDING | $2,500 |
| Sep 1, 2026 | Construction CLASS - 1 ATOI OBSERVED 4 WALL HUNGER BOILERS INSTALLED WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMIT ON FILE ALL WORK MUST BE FILED WITH THE DOB AND BE DONE BY A LICENSED MASTER PLUMBER CONTRARY TO . PC 106.1, OB #39202609Z | Nov 18, 2026 PENDING | $2,500 |
| Sep 1, 2026 | Construction CLASS - 1 ATOI OBSERVED A GAS LEAK ON BOILER NUMBERED 1 GAS TO THAT UNIT WAS SHUT BY NATION GRID ALSO IN THE BOILER ROOM COPPER PIPE WITH NO SUPPORT HELD BY A SHOE LACE AND IN THE LAUNDRY ROOM PVC TRAP IS BEING USED ON T #39202608R | Nov 18, 2026 PENDING | $2,500 |
| Sep 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FOUND CARBON MONOXIDE LEAK LOCATED ON 1ST FLOOR LEVEL IN BOILER AND SPRINKLER ROOMS., REPAIR AND/REPLACE #39126011M | May 13, 2027 | $3,125 |
| Sep 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED EXCESSIVE HOLE PENETRATION IN UTILITY/MECHANICAL ROOMS THROUGHOUT THE BU #39126012Y | May 13, 2027 | $6,250 |
| Sep 27, 2024 | Construction CLASS - 1 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. OBSERVED COMBUSTIBLE MATERIAL (BOXES, MINI FRIDGE, MICROWAVE, LIGHTING) IN HALLWAY OBSTRUCTING DOORWAY OF BOILER ROOM AND SPRINKLER ROOM. POTENTIAL FIRE HAZ #39126013X | May 13, 2027 | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12100 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12099 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 1, 2026 | ECB | Unknown: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE KITCHEN 40 AMP ELECTRIC OVEN INSTALLED WITH NEW BREAKER, EMT PIPES, ALSO IN THE BOILER RM NEW HUNG BOILERS INSTALLED WITH NEW ELECTRIC EMT, TOGGLE SW ONE NEW HO | Open |
| Sep 1, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED LACK OF SPRINKLER COVERAGE IN HALLWAYS ON 2ND & 3RD FLOORS SOFFITS WERE ADDED WHERE SPRINKLER HEADS USED TO BE CAUSING 15-20FT OF LACK OF COVERAGE CONTRARY TO BC 903.3.3, REPA | Open |
| Sep 1, 2026 | ECB | Construction: ATOI OBSERVED 4 WALL HUNGER BOILERS INSTALLED WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMIT ON FILE ALL WORK MUST BE FILED WITH THE DOB AND BE DONE BY A LICENSED MASTER PLUMBER CONTRARY TO . PC 106.1, OB | Open |
| Sep 1, 2026 | ECB | Construction: ATOI OBSERVED A GAS LEAK ON BOILER NUMBERED 1 GAS TO THAT UNIT WAS SHUT BY NATION GRID ALSO IN THE BOILER ROOM COPPER PIPE WITH NO SUPPORT HELD BY A SHOE LACE AND IN THE LAUNDRY ROOM PVC TRAP IS BEING USED ON T | Open |