Brooklyn · Block 4106 · Lot 39 · 11208

852 Jamaica Avenue

3 floors · 102,388 sq ft · built 1998 · class W1 · owner of record: Nyc Department Of Education

11open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4106). Agency page

Dec 31, 2026
in 46 days
Due this year
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 102,388 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Mar 30, 2026Construction CLASS - 2
EXIT DOOR NOT CLOSING NOTED:AT 2ND FL AUDITORIUM 1ST FL CAFETERIA STAIR C,EXIT 4,9 DOORS ARE IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIRAND REPAIR DOOR.
#35732624J
Apr 13, 2026
POP/IN-VIO
$0
Mar 30, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 2ND FL LIBRARY RM 201 WITH NO EMERGENCY LIGHTS AND E
#35732625L
Apr 13, 2026
POP/IN-VIO
$0
Jul 1, 2025Construction CLASS - 2
FAILURE TO PROVIDE POWER FOR EMERGENCY EXIT LIGHTING MANY EXIT LIGHT AND EMG LIGHT AROUND SCHOOL NOT WORKING WHEN TESTED. REMEDY: PROVIDE ADEQUATE POWER FOR EMERGENCY EXIT LIGHTING.
#35721261X
Aug 15, 2025
POP/IN-VIO
$0
DOB (4)
IssuedViolationStatus
Dec 17, 2021ELEVATOR

#9027/710816
DOB VIOLATION - ACTIVE
Dec 17, 2021ELEVATOR

#9027/710817
DOB VIOLATION - ACTIVE
Nov 13, 2020ELEVATOR

#9027/694028
DOB VIOLATION - ACTIVE
Nov 13, 2020ELEVATOR

#9027/694029
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 4:43 AM ET. BBL 3041060039.

Look up another building