4 floors · 32 apartments · 27,838 sq ft · built 1920 · class R4 · owner of record: 850 Metropolitan Ave. Investors, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 27,838 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 7, 2019 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY THE CONSTRUCTION OPERATIONS:NO OHP.AT THE TIME OF MY INSPECTION APPROVED 4 STORY ALETERATION I OBSERVED NO OVERHEAD PROTECTION AT EXPOSURE#2 AND #3.THER #35453539N | Feb 12, 2020 IN VIOLATION | $10,000 |
| Oct 7, 2019 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT THE TIME OF THE INSPECTION OF A PROPOSED 4-STORY ALTERATION,I OBSERVED A BOOM LIFT STORED ON THE STREET AT EXPOSURE#1 AS WELL AS MATERIAL DELIVE #35453538L | Feb 19, 2020 IN VIOLATION | $5,000 |
| Oct 5, 2019 | Construction CLASS - 1 FAILURE TO MAITNAIN ADEQUATE HOUSEKEEPING AT TIME OF INSPECTION OF A 4STORY BUILDING I OBSERVED MATERIALS CONSISTING OF LUMBER,CEMENT AND DEBRIS STORED ON SIDEWALK AT EXP#1 IN CLOSE PROXIMITY TO PEDESTRIANS WIT #35418735R | Feb 10, 2020 IN VIOLATION | $2,500 |
| Oct 5, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS AT TIME OF INSPECTION OF A 4 STORY BUILDING I OBSERVED MATERIAL AND EQUIPMENT STORED ON STREET EXP#1 AND BARRIERS(YODOCK SYSTEM)PROVIDED NOT INSTALLED AS PER M #35418734P | Feb 10, 2020 IN VIOLATION | $2,500 |
| Apr 5, 2019 | Construction CLASS - 2 FAILURE TO PROVIDE COMPLETE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOBSITE AT TIME OF INSPECTION AT TIME OF INSPECTION OBSERVED ALTERARION WORK IN PROGRESS ONA 1 STORY BUILDING OBSERVED WORKERS DOING DEMO #35412294N | Oct 2, 2019 IN VIOLATION | $312 |
| Mar 9, 2019 | Construction CLASS - 1 HOUSEKEEPING. AT TIME OF MY INSPECTION OBSERVED ACTIVE JOB SITE. THE HOUSEKEEPING HAS NOT BEEN MAINTAIN AS REQUIRED. 4 STORY BUILDING AT EXPOSURE-4 STYROFOAM INSTALLING ON EXPOSURE WALL BY MANLIFT WAS NOT PROVI #35363841P | Jun 24, 2019 IN VIOLATION | $2,500 |
| Mar 9, 2019 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AT TIME OF MY INSPECTION OBSERVED ACTIVE JOB SITE. THE CONSTRUCTION DEBRIS WAS FALLING AT EXPOSURE-1 UNDER SIDEWALK SHED ON PEDE #35363842R | Jun 24, 2019 IN VIOLATION | $5,000 |
| Dec 4, 2018 | Construction CLASS - 1 SEC. 3303.14 FAILURE TO PROVIDE ADEQUATE WATER DRAINAGE TO PREVENT WATER ACCUMULATION AT CONSTRUCTION,DEMOLITION &/OR EXCAVATION SITE. AT TIME OF INSPECTION OF AN ALTERATION BLDG ACTIVE JOBSITE AT ROOF LEVEL. #35377826Y | Jun 19, 2019 IN VIOLATION | $2,500 |
| Dec 4, 2018 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-NO OVERHEAD PROTECTION AT TIME OF INSPECTION OF AN ALTERATION BLDG ACTIVE JOBSITE AT ROOF LEVEL. I OBSERVED THAT THERE WERE NO OVE #35367471P | Jun 19, 2019 IN VIOLATION | $5,000 |
| Dec 4, 2018 | Construction CLASS - 1 SEC. 3314.4.3.3 FAILURE TO PROVIDE POST INSTALLATION LETTER FOR SUPPORTED SCAFFOLD. AT TIME OF INSPECTION OF AN ALTERATION BLDG ACTIVE JOB SITE AT ROOF LEVEL I OBSERVED AT EXP#1&3 SUPPORTED SCAFFOLD OVER 40' #35367474K | Jun 17, 2019 IN VIOLATION | $2,500 |
| Dec 4, 2018 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILS TP PERFORM DUTIES AS REQUIRED. THE FOLLOWING VIOLATING/UNSAFE CONDITIONS WERE OBSERVED ON THIS DATE W/SLOP WORK ORDER ISSUED: 1)NO OVERHEAD PROTECTION AT CORNER EX¢#1 & 4. #35377827X | Jun 19, 2019 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |