3 floors · 6 apartments · 4,125 sq ft · built 1931 · class C2 · owner of record: Flushing Residence Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 28, 2026 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND/OR THE DEPARTMENT OF BUILDING RECORDS. PARTITION ERECTED CREATING A DUPLEX APARTMENT AT CELLAR IN CONJUNCTION WITH APT 1A ROOMS USED FOR SLEEPING WITH THE FLOOR #35724188M | Nov 25, 2026 PENDING | $1,250 |
| Oct 17, 1996 | Construction Non-Hazardous FAILURE TO MAINTAIN BLDG DEFECTS AT REAR CELLAR.1FLR JOISTS@PLUMBING WASTE LINES/UNDER BATHROOM AREA ARE POTTED + DEFECTICE.REMEDY:MAKE ALL NECESSARY REPAIRS. #34147942L | Apr 7, 1997 WRITTEN OFF | $0 |
| Feb 24, 1994 | Construction Hazardous FAILRUE TOMAINTAIN THE FRONT SIDEWALK (BROKEN LOOSE AND DEFECTIVE AT FRONT OF FACADE WITH WOOD GIRDER BELOW A FOUNDATION WALL DETERIATED & DEFECTIVE. REMEDY:MAKE ALL NECESSARY REPAIRS TO THE SATISFACTION OF TH #34104837J | May 16, 1994 WRITTEN OFF | $0 |
| Mar 16, 1993 | Construction Non-Hazardous FAILURE TO MAINTAIN EXTERIOR BUILDING WALL;IN THAT ENTIRE LINTEL OVER WINDOWS AND DOOR ON THE NORTH FACADE(BRICK)IS CRACKED VARIOUS LOCATIO-NS AND EXTERIOR WEST WALL DEFECTIVE OUT OF PLUMB.REMEDY:REPLACE AND RE #34088915Z | May 17, 1993 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #22130 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 6, 2026 | A | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 9, 2026 |
| Jul 6, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ROOM BEING USED FOR SLEEPING PURPOSES AT CELLAR | Jul 12, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 6, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Jul 6, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ROOM BEING USED FOR SLEEPING PURPOSES AT CELLAR | Open |
| Jul 6, 2026 | HPD A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION BREACHING THE FLOOR SLAB AND INSTALLING STAIRCASE TO CONNECT 1ST STORY AND CELLAR TO CREATE A DUPLEX APARTMENT LOCATED AT APT 1R, 1st STORY | Closed |
| Jul 6, 2026 | HPD B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS WATER CLOSET, WASH BASIN, SHOWER STALL AT CELLAR | Closed |
| Jun 28, 2026 | ECB | Construction: OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND/OR THE DEPARTMENT OF BUILDING RECORDS. PARTITION ERECTED CREATING A DUPLEX APARTMENT AT CELLAR IN CONJUNCTION WITH APT 1A ROOMS USED FOR SLEEPING WITH THE FLOOR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:01 PM ET. BBL 3031380023.