3 floors · 3 apartments · 4,650 sq ft · built 1931 · class C0 · owner of record: Ridgewood Bushwick Homesteading Assistan Ce Housing
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 29, 2026 | B | Apt A1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST WALL IN THE FOYER LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2026 |
| Jul 29, 2026 | B | Apt A1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK , 1st STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | Apt 2A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2026 |
| Jul 29, 2026 | B | Apt A1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EXHAUST FAN AT THE CEILING IN THE KITCHEN LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2026 |
| Jun 24, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE , 1st STORY | Jul 8, 2026 |
| Jun 24, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Sep 27, 2026 |
| Oct 16, 2023 | B | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16043860 ISSUED 06-JUN-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3 | Nov 20, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 29, 2026 | HPD C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE WEST WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed |
| Jul 29, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE WEST WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed |
| Jul 29, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST WALL IN THE FOYER LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Jul 29, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Jul 29, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK , 1st STORY | Open |
| Jul 29, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Jul 29, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EXHAUST FAN AT THE CEILING IN THE KITCHEN LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 8:14 PM ET. BBL 3031860047.