Manhattan · Block 409 · Lot 5 · 10002

85 Delancey Street

4 floors · 26,856 sq ft · built 1935 · class O5 · owner of record: 85 Delancey Corp

33open violations
$10,312ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 1 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 26,856 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028

Open violations

ECB / OATH (6) · $10,312 owed
IssuedViolationHearingBalance
Oct 27, 2026Construction CLASS - 1
ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 - 28-118.3.2. I OBSERVED THE ENTIRE BUILDING OCCUPIED WITHOUT NEW CO BEING ISSUED FOR ALT 1 JOB #121417074 WITH PERMI
#39209518P
Dec 31, 2026
PENDING
$2,500
Jul 8, 2021Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN CONTROLLER AS MANDATED IN APPENDIX K OF THE 2014 BUILDING CODES. REMEDY: INSTALL DLM, FILE AND PERFORM TEST WITH NYC DOB,CAT 1 TAGS EXPIRED, PHONE NOT WORKING
#39044140J
Oct 21, 2021
DEFAULT
$6,250
Aug 26, 2019Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT. NOTED, AT THE TIME OF INSPECTION OBSERVED IN 3RD FLOOR AT THE YARD IN THE RIGHT APT. ONE CEILING BEAM INFECTED DUE TO RUST AND WALL NEED MAINTENANCE IN THE KITCHE
#39008468P
Oct 10, 2019
DEFAULT
$1,562
Sep 12, 2014Construction CLASS - 1
50A. 50A-NO WORK PERMIT FILED W/D.O.B. FOR NEW GAS FIRED WELL MCLAIN BOILER.
#32074611J
Oct 30, 2014
IN VIOLATION
$0
Sep 12, 2014Boilers CLASS - 2
B254/ 15/ 16/ 32A/ 32B/ 34A/ 36/ 50A/ 50B/ 50C/ 50D/ (50A) REMOVE UNUSED DUCT WORK FROM BOILER ROOM (50B) BOILER ROOM NOT A STORAGE ROOM (50C) PIPE SAFETY OR RELIEF VALVE UP RIGHT (50D) SECOND LOW WATER CUT OF
#32074610H
Feb 5, 2015
IN VIOLATION
$0
Feb 10, 2009Boilers CLASS - 1
B154 51 51 BOILER CRACKED & EMITING FUMES OF STEAM FROM THE CHIMNEY SEAL BOILER
#32065420M
Apr 2, 2009
WRITTEN OFF
$0
DOB (12)
IssuedViolationStatus
Sep 29, 2025CONSTRUCTION
AT TIME OF INSPECTION OBSERVED VISIBLE CRACKS WITH SPALLING BRICKS BUILDING FACADE AT ALL EXPOSURES OF 262 DELANCY STREET. WHICH CREATES A SAFETY HAZARD FOR OCCUPANTS OF ADJACENT PROPERTY AT 87 DELANCY STREET.
#25-02234
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2200061
DOB VIOLATION - ACTIVE
Oct 27, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00014
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2000148
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#00595
DOB VIOLATION - ACTIVE
Dec 3, 2014FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00018
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#00613
DOB VIOLATION - ACTIVE
Oct 8, 2010ELEVATOR ANNUAL INSPECTION / TEST

#00375
DOB VIOLATION - ACTIVE
Oct 1, 2005LOCAL LAW 10/81 - ELEVATOR

#00320
DOB VIOLATION - ACTIVE
Nov 19, 2004LOCAL LAW 10/81 - ELEVATOR

#00228
DOB VIOLATION - ACTIVE
Apr 21, 2004LOCAL LAW 10/81 - ELEVATOR

#00242
DOB VIOLATION - ACTIVE
Oct 24, 1994CONSTRUCTION

#101PR08
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (16)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Dec 8, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 27, 2021AEUHAZ FTC-AEU-HAZ
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 14, 2016Elevators ACC1
Active
Dec 3, 2014AEUHAZ FTC-AEU-HAZ
Active
May 30, 2014Elevators ACC1
Active
Oct 8, 2010Elevators VCAT1
Active
Oct 1, 2005Elevators LL1081
Active
Nov 19, 2004Elevators LL1081
Active
Apr 21, 2004Elevators LL1081
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 27, 2026ECBConstruction: ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 - 28-118.3.2. I OBSERVED THE ENTIRE BUILDING OCCUPIED WITHOUT NEW CO BEING ISSUED FOR ALT 1 JOB #121417074 WITH PERMIOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 12:37 PM ET. BBL 1004090005.

Look up another building