14 floors · 223 apartments · 269,019 sq ft · built 1966 · class RM · owner of record: Greenbriar Condo Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 269,019 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $8,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 850 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9651). Agency page | Dec 31, 2031 in 1893 days | Next due 2031 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 28, 2016 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT SUB CELLAR GARAGE CONCRETE CEILING HAS AREAS THAT HAVE DETACHED PIECES OF STUCCO FINISH & CONCRETE,ALSO NOTED SEVERAL AREAS OF CEILING APPEAR TO BULG #35212966K | Feb 7, 2017 IN VIOLATION | $0 |
| Oct 28, 2016 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR &/OR HARDWARE PER BC 1008.1.8. NOTED: KEY LOCKING DEVICE ON WROUGHT IRON GATE AT TOP OF STAIR WELL FROM GARAGE EXIT PASSAGEWAY TO STREET #35212965Z | Feb 7, 2017 IN VIOLATION | $0 |
| Jan 7, 2014 | Construction CLASS - 2 FAILURE TO MAINTAIN OBSERVED. AT LOWER LEVEL CEILING OF PARKING GARAGESCALING SPALLING CONCRETE AT SEVERAL LOCATIONS, ELECTRICAL BOX WITH EXPOSED WIRE HANGING. RMDY: MAINTAIN BUILDING. #35033180P | May 13, 2014 WRITTEN OFF | $0 |
| Jan 7, 2014 | Construction CLASS - 1 FAILURE TO MAINTAIN EGRESS CLEAR AND UNOBSTRUCTED OBSERVED: AT REAR EXIT FROM BOTH LEVELS OF PUBLIC PARKING GARAGE - EMERGENCY EXIT DOOR TO STREET REMOVED PANIC HARDWARE AND INSTALLED METAL ANGLE AND BAR, #35033179H | May 13, 2014 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 30, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911261 | DOB VIOLATION - ACTIVE |
| Oct 22, 2018 | FACADE SAFETY PROGRAM #HAZ87645 | DOB VIOLATION - ACTIVE |
| Aug 22, 2018 | CONSTRUCTION BORO COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR # 421270270 DUE TO APPLICANT WITHDRAWAL #C0901XZ | DOB VIOLATION - ACTIVE |
| Jan 25, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00637 | DOB VIOLATION - ACTIVE |
| Apr 9, 2014 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00403 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #03099 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 30, 2023 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Oct 22, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Jan 25, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 9, 2014 | AEUHAZ FTC-AEU-HAZ | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 6, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL, BULKHEAD EAST, TO ROOF, B AT FIRE STAIRS, 13th STORY | Jul 11, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 2:07 PM ET. BBL 4096517501.