2 floors · 85,967 sq ft · built 1967 · class K6 · owner of record: Dayton Towers Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2019-12-16 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 85,967 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 16131). Agency page | Dec 31, 2031 in 1884 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 17, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED CONCRETE ON WALKWAY SLIGHTLY ELEVATED APPROX. .5 INCH IN HEIGHT CREATING POTENTIAL TRIPPING HAZARD, REPAIR AND/OR REPLACE #39180814N | May 26, 2026 DEFAULT | $6,250 |
| Feb 2, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39079450P, FILE A CERTIFICATE OF CORRECTION #39175646R | Apr 14, 2026 DEFAULT | $6,250 |
| Nov 2, 2023 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS. NOTED; SUMMONS 39079450P ISSUED ON 2/9/2023 HAS NOT FILED A COC AS OF DATE., FILE A CERTIFICATE OF CORRECTI #39098591M | Mar 5, 2024 DEFAULT | $3,125 |
| Nov 2, 2023 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS. NOTED; SUMMONS 39089528P ISSUED ON 6/30/2023 HAS NOT FILED A COC AS OF DATE., FILE A CERTIFICATE OF CORRECT #39098592Y | Mar 5, 2024 DEFAULT | $3,125 |
| Jun 30, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED; AT FRONT PARKING LOT TO STRIP MALL, INSTALLED PVC LEADER PIPE FOR RAIN THAT ARE NOT CONNECTED TO STORM DRAINS. AT KEY FOOD SHOPPING LEFT SIDE META #39089528P | Sep 5, 2023 DEFAULT | $3,125 |
| Feb 9, 2023 | Construction CLASS - 1 SEVERAL PRE-CAST CONCRETE COLUMNS, AT EXTERIOR#1 ARE CRACKED, REPAIR AND/REPLACE; REPAIR AND/OR REPLACE #39079450P | Mar 12, 2024 DEFAULT | $12,500 |
| Jan 12, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A COD-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED SEVERAL PRECAST CONCRETE COLUMNS AT FRONT EXTERIOR THAT ARE CRACKED AND EXPANDING. AT LEFT SIDE EXTERIOR OF KEY FOOD #39054541J | Mar 8, 2022 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00695 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01543 | DOB VIOLATION - ACTIVE |
| Oct 26, 2025 | CONSTRUCTION STRUCTRE RENDERED NON COMPLIANT. MOTOR VEHICLE IMPACTED BUILDING CAUSI NG , NON STRUCTURAL DAMAGE TO AN AREA OF APPROXIMATELY 2'X18'OF KNEE W ALL AND DISPALCING ROOL DAON GATE GUIDE. STRUCTURE MUST BE MAINTAIN IN CODE COMPLAINT MANNER #CER01EP | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00749 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01637 | DOB VIOLATION - ACTIVE |
| Jul 11, 2024 | PLUMBING THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE THE PERMIT AND APPROVALS ISSUED IN CONNECTION TO JOB# Q00957366. DUE TO SUSPENSION OF THE MASTER PLUMBER'S LICENSE #2286. ALL PLUMBING WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERED STOPPED IMMEDIATELY. #24-01872 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02306 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03640 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02510 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01256 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00111 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #02024 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00901 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #01024 | DOB VIOLATION - ACTIVE |
| Feb 2, 2018 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00376 | DOB VIOLATION - ACTIVE |
| Nov 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00447 | DOB VIOLATION - ACTIVE |
| Aug 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00584 | DOB VIOLATION - ACTIVE |
| May 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01107 | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01033 | DOB VIOLATION - ACTIVE |
| Feb 2, 2016 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00584 | DOB VIOLATION - ACTIVE |
| Nov 2, 2015 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00700 | DOB VIOLATION - ACTIVE |
| Aug 2, 2015 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01015 | DOB VIOLATION - ACTIVE |
| May 2, 2015 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01496 | DOB VIOLATION - ACTIVE |
| Jun 3, 2013 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01282 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #03256 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02934 | DOB VIOLATION - ACTIVE |
| Jul 19, 2008 | CONSTRUCTION #ER02TZ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 14) | Active |
| Sep 23, 2024 | Boiler HBLVIO Violation Issued-Failure To File 2023 Internal High Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Feb 2, 2018 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2016 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 2, 2016 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2015 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2015 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2015 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 3, 2013 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 9:40 AM ET. BBL 4161310010.