3 floors · 101,354 sq ft · built 1958 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-23 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 101,354 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9724). Agency page | Dec 31, 2034 in 2984 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 24, 2026 | Construction CLASS - 2 REISSUE:35719982N DATE OF ISSUE:05.13.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT MAIN ENTRANCE EXIT 16 EXTERIOR RAILING IS BROKEN & DETACHED FROM #35732237J | Jun 4, 2026 POP/IN-VIO | $0 |
| Apr 24, 2026 | Construction CLASS - 2 REISSUE:35719980J DATE OF ISSUE:05.13.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CORRIDOR BY 223,STAIR H GYM ENTRANCE 141 CORRIDOR BY 109,114 1ST #35732238L | Jun 4, 2026 POP/IN-VIO | $0 |
| Apr 24, 2026 | Construction CLASS - 2 REISSUE:35719976R DATE OF ISSUE:05.13.2025 EXIT DOOR NOT SELF CLOSING PROPERLY AT THE TIME OF INSPECTION.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR STAIRWAY-B ONE EXIT DOOR,1ST FL EXIT 6 ONE EXIT #35732242Y | Jun 4, 2026 POP/IN-VIO | $0 |
| Apr 24, 2026 | Construction CLASS - 2 REISSUE#35719978K DATE OF ISSUE:05.13.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERV #35732240K | Jun 4, 2026 POP/IN-VIO | $0 |
| Apr 24, 2026 | Construction CLASS - 2 REISSUE#35719979M DATE OF ISSUE:05.13.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED FOR DIFECTIVE HARDWARE DOOR CHECKS AND HINGES AT 3RD FL RM 308,314,3 #35733001H | Jun 4, 2026 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT CORRIDOR BY 223,STAIR H,GYM ENTRANCE,141 CORRIDOR BY 109,114,1 FL STAIR E,GLASS PANELS INDOORS MISSING OR BROKEN.REM:REPAIR AND/OR REPLACE GLASS. #35719980J | Jul 22, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE#35677443L EXIT DOOR NOT SELF-CLOSING.NOTED AT 3 FLOOR SMOKE STAIR C,2 FL(S)STAIR C,E,1 FL STAIR A,C,& D,F & G BASE-(S)6 & 7,STAIR A AND EXIT 3 & 4,5,6 & 7 AND 12 DOORS ARE NOT SELF-CLOSING.REM:REPAIR/RE #35719976R | Jul 22, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE#35677441H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED AT MAIN ENTRANCE 2 EXIT SIGNS,AUDITORIUM 1(ES),3 EM #35719978K | Jul 22, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT MAIN ENTRANCE EXIT 16 EXTERIOR RAILING IS BROKEN & DETACHED FROM GROUND.REM:REPAIR AND/OR REPLACE RAILING. #35719982N | Jul 22, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 3 FLOOR308,314,316,327,2 FL,227,1 FL.AUDIORIUM ENTRANCE,GYM ENTRANCE & BACK EXITS AND CORRIDOR BY 106 DOOR ARE NOT CLOSING PROPERLY.REM:REPAIR AND/ #35719979M | Jul 22, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE#35677442J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED AT 3 FL 301,304,305,306,308,331 AND 201C DOOR CHECKS BROKEN OR MISS #35719977Z | Jul 22, 2025 POP/IN-VIO | $0 |
| May 16, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. EXIT LIGHTS MISSING PARTS AND NOT WORKING. NONE HAVE BATTERY BACKUP OLDER UNIT. REMEDY: REPAIR AND/OR REPLACE. #35677441H | Aug 20, 2024 POP/IN-VIO | $0 |
| May 16, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CLASS ROOM DOORS DON'T CLOSE MISSING HARDWARE AND BROKEN-ALL OLDER DOORS. REMEDY: REPAIR AND/OR REPLACE. #35677442J | Aug 20, 2024 POP/IN-VIO | $0 |
| Apr 28, 2016 | Construction CLASS - 3 WORK W/OUT A PERMIT VIOLATION REISSUE# 34910575P. NOTE: @ TIME OF INSP ILLEGAL WALL ERECTED @ END OF CORRIDOR 3RD FLR ROOM 300 AS STATED IN NOV# 34910575P ISSUED ON 4/15/11. REM: REMOVE WALL OR OBTAIN PERMIT. #35178026Y | Jul 19, 2016 POP/IN-VIO | $0 |
| Apr 25, 2012 | Unknown CLASS - 2 REISSUE 34910575P WORK W/O A PERMIT NOTED THE END OF THE CORRIDOR HAS A WALL ERECTED A FULL HEIGHT PARTITION WALL W/ A DOOR OPENING CREATING A ROOM APPX 6'X8'SQFT ROOM LOCATED ON THE 3RD FL LVL REM; OBTAIN PERM #34954468Y | Jun 19, 2012 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 3:52 AM ET. BBL 4097240173.