1 floors · 1 apartments · 1,760 sq ft · built 1925 · class S1 · owner of record: Verdino, Louis
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 26, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 35719128Y, FILE A CERTIFICATE OF CORRECTION #39201967Y | Nov 10, 2026 PENDING | $1,250 |
| Aug 26, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 35719127M, FILE A CERTIFICATE OF CORRECTION #39201968X | Nov 10, 2026 PENDING | $1,250 |
| Jul 31, 2025 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY COFO#186281.RECORDS INDICATE 1STFLOOR TO BE LEGALLY APPROVED AS A 1 FAMILY DWELLING AND STORE.NOW,1ST FLOOR IS OCCUPIED/CONVERTED AS A HEALTH AND FITNESS ESTABLISHMENT/AMBU #35719126K | Dec 2, 2025 ADMIT/IN-VIO | $0 |
| Jul 31, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: AT 1ST FLOOR MESSAGE; ERECTED FULL HEIGHT PARTITIONS TO CREATE 3 MASSAGE ROOMS, 2 RESTING ROOMS AND 1 SHOWER ROOM(WATER AND WASTE LINES IE PLUMBING WORK). AT CELLAR LEVEL OF MASSAG #35719129X | Dec 2, 2025 ADMIT/IN-VIO | $0 |
| Jul 31, 2025 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT.UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT.A PROHIBITED USE PER ZR 12-10 OPERATING IN A C1-3 ZONING DISTRICT.DOING BUSINESS AS 8888 SPA ON THE 1ST FLOOR WITH 3 MASSAGE ROOM #35719125Z | Dec 2, 2025 ADMIT/IN-VIO | $0 |
| Jul 31, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE THE REQUIRED LIGHT AND VENTILATION FOR EVERY BEDROOM. CELLAR LEVELOCCUPIED/CONVERTED INTO SLEEPING QUARTERS WITHOUT NATURAL LIGHT AND VE #35719128Y | Dec 2, 2025 ADMIT/IN-VIO | $0 |
| Jul 31, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF REQUIREDNUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366;BC 1021.1(2014 CODE);BC 1006.3(2022 CODE)FOR CLASS A APARTMENT/SLE #35719127M | Dec 2, 2025 ADMIT/IN-VIO | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 26, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 35719128Y, FILE A CERTIFICATE OF CORRECTION | Open |
| Aug 26, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 35719127M, FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 12:57 AM ET. BBL 4113480043.