Bronx · Block 2732 · Lot 56 · 10459

847 Bruckner Boulevard

3 floors · 3 apartments · 4,095 sq ft · built 1925 · class C0 · owner of record: 847 Bruckner Corp

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (6) · C 0 · B 5 · A 1
IssuedClassViolationCorrect by
Dec 4, 2024BApt 3 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER INSTALLED AT FIRE ESCAPE WINDOW LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 8, 2025
Dec 4, 2024B§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PANIC BAR (DOES NOT ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALL) INSTALLED ON BULKHEAD ROOF DOORJan 8, 2025
Dec 4, 2024B§ 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK ON BULKHEAD ROOF DOOR THAT ALLOWS RE-ENTRY FROM ROOF TO PUBLIC HALLJan 8, 2025
Dec 4, 2024A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERECTED FROM FLOOR TO CEILING AT CELLAR , BLOCKING STAIRWAY LEADING UP TO 1ST STORY PUBLIC HALLMar 9, 2025
Dec 4, 2024B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MESH FRAME BELOW THE SKYLIGHTJan 8, 2025
Jul 16, 2018BApt 2 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... .. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTAug 20, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 4:37 PM ET. BBL 2027320056.

Look up another building