10 floors · 18 apartments · 14,844 sq ft · built 2001 · class RM · owner of record: The Second Avenue Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $72,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 119 days | No Cycle 10 report on record yet |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 8, 2009 | Unknown CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER:FLR. NUMBERING SIGNSMISSING AND/OR DEFECTIVE PER BC 1019.1.7;27-392;NOTED:(1)NO FLR. NUMB ERING AT PUBLIC HALLS OR STAIRWELLS(2)NO EMERGENCY LIGHTING AT PUBLIC #34775325N | Dec 9, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00468 | DOB VIOLATION - ACTIVE |
| Feb 21, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #909921 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01162 | DOB VIOLATION - ACTIVE |
| Feb 8, 2008 | CONSTRUCTION #MTF08RNS | DOB VIOLATION - ACTIVE |
| Feb 8, 2008 | ZONING #MTF07RNS | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 21, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 23, 2020 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY | Mar 28, 2021 |
| Dec 23, 2020 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET COVER PLATE AT NORTH WALL AT PUBLIC HALL, 10th STORY | Mar 28, 2021 |
| Dec 23, 2020 | A | § 27-2005 ADM CODE PROVIDE SAFETY COVER CAPS /PLUGS TO ELECTRICAL OUTLETS AT NORTH AND EAST WALLS AT PUBLIC HALL, 10th STORY | Mar 28, 2021 |
| Dec 23, 2020 | A | § 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS .. AT PUBLIC HALL, 10th STORY | Mar 28, 2021 |
| Dec 23, 2020 | A | § 27-2005 ADM CODE PROVIDE SAFETY COVER CAPS /PLUGS TO ELECTRICAL OUTLETS AT NORTH AND EAST WALLS AT PUBLIC HALL, 4th STORY | Mar 28, 2021 |
| Dec 23, 2020 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 10th STORY | Jan 27, 2021 |
| Dec 23, 2020 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 10th STORY | Mar 28, 2021 |
| Dec 23, 2020 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 10th STORY | Jan 27, 2021 |
| Dec 23, 2020 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT ENTRANCE DOOR TO THE BUILDING , 1st STORY | Dec 29, 2020 |
| Dec 23, 2020 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT VESTIBULE DOOR TO THE BUILDING , 1st STORY | Dec 29, 2020 |
| Dec 23, 2020 | B | § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE HEAVY DUTY LOCK AND LATCH SET AT ENTRANCE DOOR TO THE BUILDING , 1st STORY | Jan 27, 2021 |
| Dec 23, 2020 | B | § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE DOOR TO THE BUILDING , 1st STORY | Jan 27, 2021 |
| Dec 4, 2020 | C | Apt 4A · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 10, 2020 |
| Aug 26, 2010 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING , 100 WATTS REQUIRED. | Sep 30, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)